• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (3): 315-319.DOI: 10.3973/j.issn.1672-741X.2016.03.011

• 施工技术 • 上一篇    下一篇

大断面隧道高压富水变质岩地层及构造带灾害处理技术——以旧堡隧道为例

孟庆余, 苏江, 方伟   

  1. (铁道第三勘察设计院集团有限公司, 天津 300251)
  • 收稿日期:2015-08-13 修回日期:2015-09-28 出版日期:2016-03-20 发布日期:2016-03-30
  • 作者简介:孟庆余(1976—),男,吉林松原人,2001年毕业于西南交通大学,土木工程专业,本科,高级工程师,现从事隧道及地下工程管理、设计及咨询工作。Email: sdsmengqingyu@126.com。

Countermeasures for Disaster of Highpressured Waterrich Metamorphic  Strata and Tectonic Zone of Jiubao Large Crosssection Tunnel

MENG Qingyu, SU Jiang, FANG Wei   

  1. (The Third Railway Survey and Design Institute Group Corporation, Tianjin 300251, China)
  • Received:2015-08-13 Revised:2015-09-28 Online:2016-03-20 Published:2016-03-30

摘要:

旧堡隧道地处区域性构造交汇部位,地层为古老的太古界变质岩,岩石因受多期地质构造运动作用,断裂构造极为发育。隧道地下水发育且部分地段存在承压水,在施工过程中,针对掌子面突水涌碴、开挖面坍塌,采取架设临时仰拱和临时挡墙措施,加固绕避; 针对初期支护大变形、二次衬砌开裂等情况,采取超前注浆、超前大管棚和双层初期支护等措施,确保隧道衬砌结构安全; 针对隧道地下水发育情况,采用排水型防水板、边墙增设碎石盲沟并增加泄水洞等措施,确保隧道运营安全。

关键词: 铁路隧道, 承压水, 突水涌碴, 大变形, 泄水洞

Abstract:

Jiubao tunnel is located in the junction of regional tectonic whose main strata is old archaeozoic metamorphic rocks. The fault structure is developed well due to the geological structural movement. The groundwater is rich; and there is confined water in partial sections. Technologies, such as the temporary inverted arch, the temporary retaining wall, strengthening and avoidance are used so as to solve the water inrush and collapse of tunnel face. In order to guarantee the safety of tunnel lining structure, advance grouting, advance pipe roof and double primary support layers are adopted. In light of the rich groundwater, the drainagetype waterproofing plate, additional macadam blind drains and increasing drainage holes are adopted to guarantee the running safety of the tunnel.

Key words: railway tunnel, confined water, water inrush, large deformation, drainage hole

中图分类号: