隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (11): 1361-1365.DOI: 10.3973/j.issn.1672-741X.2016.11.012

• 规划与设计 • 上一篇    下一篇

水下长大隧道排水系统设计问题探讨

吕青松, 贺维国, 方祖磊, 程士好   

  1. (中铁隧道勘测设计院有限公司, 天津 300133)
  • 收稿日期:2016-04-19 修回日期:2016-07-28 出版日期:2016-11-20 发布日期:2016-11-30
  • 作者简介:吕青松(1985—),男,山东青岛人,2011年毕业于兰州交通大学,环境工程专业,硕士,工程师,现从事地下工程给排水消防设计工作。Email: aodong0532@126.com。

Discussion on Design of Drainage System of Long Underwater Tunnels

LYU Qingsong, HE Weiguo, FANG Zulei, CHENG Shihao   

  1. (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
  • Received:2016-04-19 Revised:2016-07-28 Online:2016-11-20 Published:2016-11-30

摘要:

为了使水下长大隧道排水系统设计更加合理可靠,以目前国内已建成且最为典型的水下长大隧道青岛胶州湾隧道和厦门翔安隧道为例,采用理论分析和数值计算等方法对水下长大隧道排水系统存在的问题进行梳理,并对隧道防水、水泵选型、管道系统设置、水锤防护、集水池容积确定等关键排水系统设计提出以下建议: 水下长大隧道应严格控制结构渗漏水量,充分考虑盾构法全包防水在后期运营排水上的优势; 废水泵宜选择便于检修、更换的耐腐蚀下进水式多级潜水泵; 排水系统泵管匹配宜按一拖二模式设置,至多不宜超过一拖三; 除设置水锤消除器外,还应采取废水泵缓起缓停等水锤防护措施; 废水泵房集水池的有效容积应根据风险分析确定。

关键词: 水下长大隧道, 排水系统, 高扬程潜水泵, 水锤防护, 集水池容积, 全包防水

Abstract:

The problems of existing long underwater tunnels, i.e. Jiaozhou Bay Tunnel in Qingdao and Xiang’an Tunnel in Xiamen, are studied by theoretical analysis method and numerical calculation method. The designs of keys of drainage system, i.e. tunnel waterproofing, pump selection, pipe system arrangement, water hammer protection and sump volume, are analyzed. Suggestions are given as follows: 1) The water leakage of long underwater tunnel structure should be controlled strictly, and the full waterproofing method should be used. 2) The submersible pump with high corrosion resistance should be used as waste water pump. 3) The “one pipe two pumps” scheme for drainage system is the best; and there should not be more than 3 pumps in one pipe. 4) The water hammer eliminator should be used, and water hammer protection methods should be adopted as well. 5) The effective volume of sump should be decided according to risk analysis.

Key words: long underwater tunnel, drainage system, highlift submersible pump, water hammer protection, sump volume, full waterproofing method