隧道建设(中英文) ›› 2017, Vol. 37 ›› Issue (4): 435-441.DOI: 10.3973/j.issn.1672-741X.2017.04.008

• 研究与探索 • 上一篇    下一篇

基于OWA与灰色聚类的城市轨道交通PPP融资风险评价方法研究

宋博1, 武瑞娟1, 牛发阳2   

  1. (1. 郑州信息科技职业学院建筑工程学院, 河南 郑州 450008; 2. 郑州康桥房地产开发有限责任公司, 河南 郑州 450001)
  • 收稿日期:2017-01-06 修回日期:2017-02-08 出版日期:2017-04-20 发布日期:2017-04-28
  • 作者简介:宋博(1982—),女,河南商丘人,2008年毕业于郑州大学,水工结构工程专业,硕士,讲师,现主要从事建筑工程技术与工程管理的教学与研究工作。Email: songbohnzz@163.com。
  • 基金资助:

    国家自然科学基金项目(71471094)

Research on Risk Evaluation Method of PPP Financing Mode for Urban Rail Transit Based on OWA and Grey Clustering Method

SONG Bo1, WU Ruijuan1, NIU Fayang2   

  1. (1. School of Civil Engineering, Zhengzhou Vocational University of Information and Technology, Zhengzhou 450008, Henan, China; 2. Zhengzhou Kangqiao Real Estate Development Limited Liability Company, Zhengzhou 450001, Henan, China)
  • Received:2017-01-06 Revised:2017-02-08 Online:2017-04-20 Published:2017-04-28

摘要:

针对城市轨道交通PPP融资成本高、投资回收期长、不确定性因素多等特点导致整个融资过程充满风险,且难以进行科学的评价,进而增加风险评价难度的问题,提出基于OWA与灰色聚类的城市轨道交通PPP融资风险评价方法。首先从全寿命周期角度构建城市轨道交通PPP融资风险指标体系。然后基于OWA算子对专家决策数据按照降序的方式重新排序,消除极值带来的不利影响,加权得出指标的权重值。最后考虑指标的灰色性、信息不完整性,构建灰色白化权函数实现指标信息的透明化,完成对PPP融资风险的聚类分析。应用构建的模型对郑州地铁1号线一期工程PPP融资风险进行评价,认为该地铁工程PPP融资风险等级高,应重点关注前期策划、社会资本、政策环境、设计质量、成本超支、建设质量、残值7个主要风险指标的控制,以期为该项目融资风险管理提供建议,并进一步丰富城市轨道交通PPP融资风险的评价方法。

关键词: 城市轨道交通, PPP融资, 风险评价, OWA, 灰色聚类

Abstract:

Public private partnership(PPP) financing mode for urban rail transit is full of risks, i.e. high financing cost, long payback period, various uncertain factors and difficult to evaluate scientifically and accurately. As a result, the risk evaluation method based on the ordered weighted averaging(OWA) and grey clustering method is established. The risk indicator system of PPP financing mode for urban rail transit is established in terms of project life cycle; and then the scores given by experts are reordered based on OWA operator so as to eliminate adverse effect induced by extreme values and gain the weight values of risk indicators. Finally, the grey whitening weight function is established in consideration of grey and information unintegrity of risk indicators so as to realize transparency and complete clustering analysis of financing risk of PPP financing mode. The abovementioned risk evaluation method is used to evaluate the financing risk of PPP mode in Zhengzhou Metro Line No. 1. The results show that the financing risk is of highgrade. Seven risk indicators, i.e.project planning, social capital, policy environment, design quality and cost overrun, construction quality and residual value, should be strictly controlled. The study results can provide references for risk evaluation of PPP financing mode for urban rail transit in the future.

Key words: urban rail transit, PPP financing mode, risk evaluation, OWA, grey clustering