敞开式TBM 主轴承外密封挡圈断裂脱落解决案例分析

韩小亮   

  1. (中国水利水电第三工程局有限公司, 陕西 西安 710032)
  • 收稿日期:2019-01-28 出版日期:2019-12-31 发布日期:2020-04-04
  • 作者简介:韩小亮(1972—),男,陕西商洛人,2011 年毕业于华北水利水电大学,水利水电工程专业,本科,教授级高级工程师,现主要从事TBM 施 工、水利水电工程技术工作。 E-mail: 354068901@ qq. com。

Case Study of Breaking off of Outer Sealing Ring of TBM Main Bearing

HAN Xiaoliang   

  1. (Sinohydro Bureau 3Co., Ltd., Xi′an 710032, Shaanxi, China)
  • Received:2019-01-28 Online:2019-12-31 Published:2020-04-04

摘要:

敞开式TBM 在长距离掘进过程中,由于频繁振动,可能造成主轴承外密封挡圈断裂、脱落。为解决现场更换难题,以国内某引水工程?8. 5 m 敞开式TBM 为案例,结合施工现场条件对比分析3 种处理方案的可行性、经济性,提出一种与原方案不同的创新解决方案,发明洞内TBM 主轴承外密封挡圈维修新技术。在确定主轴承密封未损坏的情况下,改变原设计的螺栓连接方式,不拆卸刀盘,将新挡圈分4 段焊接于转接座上。与常规处理的拆卸刀盘、开挖扩大洞安装整圆挡圈的方案相比,该方案作业难度大幅度减小,工作量在原方案基础上减少85%以上,耗时从最少需要4 个月减少到0. 5 个月,能为主体工程的施工进度节约大量宝贵的时间,极大降低经济成本。

关键词: 敞开式TBM, 主轴承, 外密封挡圈, 断裂脱落, 解决案例

Abstract:

In long distance shield tunneling of open-type TBM, the outer sealing ring may cause breakage and shedding due to frequently vibration. In order to solve the problem, taking the open TBM with ?8. 5 m in a domestic water diversion project as an example, combined with the construction site conditions, the feasibility and economy of three treatment schemes are made a contrastive analysis. An innovative solution is proposed and a new maintenance technology for outer sealing ring of TBM main bearing is developed. If the main bearing seal is undamaged, the bolt connection mode of the original design can be changed. The new gear ring is installed in four sections and welded to the connecting seat and without removing the cutter head. If the main bearing seal is undamaged, the bolt connection mode of the original design can be changed. The new gear ring is installed in four sections and welded to the connezcting seat and without removing the cutter head. Compared with the regular treatment which is required to dismantle the cutter head and excavate and expand the hole to install the full circle, the new scheme is much easier and with reduction of the workload by more than 85% on the original basis, shortening the construction time from four months to half a month, which saved a lot of valuable time for the construction schedule and greatly reduced the economic costs.

Key words: open-type hard rock TBM, main bearing, outer sealing ring, breaking off, solution case

中图分类号: