• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2020, Vol. 40 ›› Issue (1): 66-73.DOI: 10.3973/j.issn.2096-4498.2020.01.009

• 研究与探索 • 上一篇    下一篇

地面堆载诱发下既有盾构隧道纵向变形的解析解

张  勇1, 马金荣1, 陶祥令1, 2, 李  阳3   

  1. (1. 中国矿业大学 深部岩土力学与地下工程国家重点实验室, 江苏 徐州  221116; 2. 江苏建筑职业技术学院能源与交通工程学院, 江苏 徐州  221116; 3. 中国建筑股份有限公司, 北京  100029)
  • 收稿日期:2019-09-07 出版日期:2020-01-20 发布日期:2020-04-04
  • 作者简介: 张勇(1995—),男,江苏淮安人,中国矿业大学岩土工程专业在读硕士,研究方向为隧道及地下结构工程。 E-mail: 571123092@ qq.com。
  • 基金资助:
    江苏省高校自然科学研究面上项目资助(16KJB580014); 中建股份科技研发计划资助(CSCEC-2017-Z-25); 江苏省青蓝工程资助; 江 苏省住建厅项目(2017ZD094); 江苏建筑职业技术学院院级课题资助(JYJBZX16-3)

Analytical Solution of Longitudinal Deformation of Existing Shield Tunnel Induced by Surface Surcharge

ZHANG Yong1, MA Jinrong1, TAO Xiangling1, 2, LI Yang3   

  1. (1. State Key Laboratory of Deep Geotechnical Mechanics and Underground Engineering, China University of Mining and Technology, Xuzhou 221116, Jiangsu, China; 2. College of Energy and Transportation Engineering, Jiangsu Vocational Institute of Architectural Technology, Xuzhou 221116, Jiangsu, China; 3. China State Construction Engineering Corporation, Beijing 100029, China)
  • Received:2019-09-07 Online:2020-01-20 Published:2020-04-04

摘要: : 为研究地面堆载作用对既有盾构隧道纵向变形的不利影响,将既有盾构隧道简化为置于Pasternak地基上的Timoshenko梁 (定义为T-P模型),通过理论推导得到考虑盾构隧道剪切效应和地基剪切刚度的地面堆载诱发下,既有盾构隧道纵向变形的解析 解。 研究结果表明: 1)与其他模型计算结果相比,在实测数据的最大值附近,T-P理论模型计算结果与实测数据更为吻合,从而验 证该模型的可靠性。 2)在隧道纵向变形计算上,T-P模型相比常用Euler-Bernoulli梁模型计算结果较大,而稍小于T-W模型计算 结果,更接近实际监测数据; 在内力计算上,Euler-Bernoulli梁模型计算结果较大,常用的EB-W模型弯矩、剪力最大值均为T-P模 型的1.3倍。 3)随着隧道与堆载中心水平距离的增大,隧道竖向变形减小; 提高土层弹性模量以及隧道等效抗弯刚度可以有效减 少隧道竖向变形; 当等效剪切刚度超过一定数值后,隧道变形趋于稳定。

关键词: 盾构隧道, 地面堆载, 纵向变形, T-P模型, 剪切效应, 解析解

Abstract: The study of adverse effect of surface surcharge on the longitudinal deformation of existing shield tunnel is of great significance. As a result, an analytical solution for the longitudinal deformation of existing shield tunnel induced by surface surcharge considering the shearing effect of shield tunnel and shearing stiffness of the foundation is presented. This solution assumes that the shield tunnel is a Timoshenko beam resting on Pasternak foundation (defined as T-P Model). The results show that: (1) Compared with other model calculation results, the results of theoretical model proposed in this paper are more consistent with the measured data near the maximum value, which verifies the reliability of T-P model. (2) As for the calculation of the longitudinal deformation of tunnel, the results of T-P model proposed in this paper is larger than that of the Euler Bernoulli beam model, but smaller than that of the T-W model, which shows that the T-P model results are closer to the actual monitoring data; as for the calculation of internal force, the calculation results of Euler Bernoulli beam model are larger, and the maximum bending moment and shearing force of EB-W model are 1.3 times that of T-P model proposed in this paper. (3) With the increase of the horizontal distance from the tunnel axis to the load center, the vertical deformation of tunnel decreases gradually; by increasing the elastic modulus of soil layer and the equivalent bending stiffness of tunnel, the vertical deformation of tunnel can be effectively reduced; when the equivalent shearing stiffness exceeds a certain value, the tunnel deformation tends to be stable.

Key words: shield tunnel, surface surcharge, longitudinal deformation, T-P model, shearing effect, analytical solution

中图分类号: