悬臂掘进机在滇西红层隧道中的应用研究

朱廷宇, 王唤龙, 宋智来, 罗茂林, 张磊   

  1. (中铁二院工程集团有限责任公司, 四川 成都 610031)
  • 出版日期:2021-03-20 发布日期:2021-04-03
  • 作者简介:朱廷宇(1990—),男,四川简阳人,2016年毕业于西南交通大学,建筑与土木工程专业,硕士,工程师,现从事隧道与地下工程设计与研究工作。E-mail: 996423944@qq.com。
  • 基金资助:
    中国国家铁路集团有限公司重大课题(P2018G048

Application of BoomType Roadheader in RedBed Tunnel in West Yunnan

ZHU Tingyu, WANG Huanlong, SONG Zhilai, LUO Maolin, ZHANG Lei   

  1. (China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)
  • Online:2021-03-20 Published:2021-04-03

摘要: 为解决滇西红层隧道支护变形风险高、单线小断面铁路隧道由于空间受限施工速度慢等问题,结合滇西红层以紫红色泥岩、砂岩为主,节理裂隙较发育,围岩强度适中等工程地质特征,依托大瑞铁路秀岭隧道进口平导,在滇西红层小断面隧道中引入悬臂掘进机施工,通过在适应性、设计参数等方面的深入研究,并与钻爆法在投资、施工进度、安全质量等方面进行对比分析,证明悬臂掘进机在滇西红层地区具有较好的适应性,具备较高的推广应用价值。应用研究结果表明: 1)悬臂掘进机适用于围岩强度适中、围岩(较)破碎、节理裂隙(较)发育以及地下水不(弱)发育的隧道; 2)悬臂掘进机对滇西红层围岩扰动小,初期支护可取消系统锚杆,并可以加大钢架间距; 3)悬臂掘进机在滇西红层隧道施工中进度优势明显,特别对于Ⅳ级围岩,进度较钻爆法提高了近67% 4)悬臂掘进机早期资金投入较钻爆法高,且各级围岩条件下悬臂掘进机开挖单价为钻爆法的45倍。

关键词: 悬臂掘进机, 滇西红层隧道, 适应性, 设计参数, 钻爆法

Abstract: The support deformation risk of tunnel in red beds in west Yunnan is high, and the construction speed of singletrack small crosssection tunnel is low because of space limitations. The geological conditions of red beds in west Yunnan include purplishred mudstone and sandstone, developed joint fissures, and moderate surrounding rock strength. Accordingly, a boomtype roadheader is adopted in a small crosssection tunnel of the pilot heading of Xiuling tunnel on DaliRuili railway in red beds in west Yunnan. An indepth study is conducted on the feasibility and design parameters of the boomtype roadheader, and it is compared with the drill and blast method in terms of cost, schedule, and quality. The results show the following for the boomtype roadheader: (1) Suitability for tunnels with moderate surrounding rock strength, broken surrounding rocks, developed joints and cracks, and insufficient underground water. (2) It mildly disturbs the surrounding rock of red beds in west Yunnan; thus, the system bolt for primary support can be eliminated, and the steel frame spacing can be increased. (3) Superiority to other methods in red beds in west Yunnan in terms of construction speed, especially for Grade surrounding rock, the boring speed can be improved by approximately 67%. (4) A higher early capital investment than the drill and blast method, with excavation cost per unit of approximately 4~5 times that of the drill and blast method.

Key words: boomtype roadheader, redbed tunnel in west Yunnan, adaptability, design parameters, drill and blast method

中图分类号: