风积沙地区公路隧道施工方案研究

董长松1,黄俊文2, 肖均2   

  1. 1.中交第一公路勘察设计研究院有限公司, 西安 710075; 2. 陕西榆林榆神高速公路有限公司, 陕西 榆林 719000
  • 收稿日期:2010-12-22 修回日期:2011-03-22 出版日期:2011-04-20 发布日期:2011-05-11
  • 作者简介:董长松(1982—),男,陕西乾县人,2010年毕业于长安大学桥梁与隧道工程专业,硕士研究生,助理工程师,从事隧道与地下工程领域的研究工作。

Study on Construction Programs of Highway Tunnels in Aeolian Sand Areas

DONG Chang-Song1, HUANG Dun-Wen2, Xiao-Jun2   

  1. 1. CCCC First Highway Consultant Co., Ltd., Xi’an 710075, China;  2. Shaanxi Yulin YulinShenmu Expressway Co., Ltd., Yulin 719000, Shaanxi, China
  • Received:2010-12-22 Revised:2011-03-22 Online:2011-04-20 Published:2011-05-11

摘要:

为积累风积沙地区公路隧道施工经验,以榆神高速神木1号隧道工程为依托,对该隧道在风积沙段施工中采用的3种施工方案进行了详细介绍,并采用数值模拟和监控量测手段,同时结合现场施工情况,对3种方案的沉降控制效果、施工技术难度和施工周期等进行了对比研究。总结出了其各自的适用条件:小导管+上下台阶临时仰拱法适用于工期紧张,需要快速施工且对地表沉降没有严格控制要求或允许较大地表沉降的场合;水平旋喷桩+三台阶临时仰拱法适用于对地表沉降有严格控制要求的场合;大管棚+上下台阶临时仰拱法在介于上述情况之间时适用。

关键词: 风积沙, 隧道工程, 小导管, 大管棚, 水平旋喷桩, 临时仰拱, 沉降控制

Abstract:

Three construction programs adopted in the construction of No.1 Shenmu Tunnel on YulinShenmu expressway are presented in detail in order to accumulate experiences in the construction of tunnels in aeolian sand areas. The settlement control results, the difficulties in the construction technologies and the construction periods are comparatively studied by means of numerical simulations and monitoring. Conclusions drawn are as follows: 1) “small duct + top heading/bench + temporary invert” method is applicable for cases in which rapid construction is needed due to the tight construction schedules and there are no strict requirements on the settlement control; 2) “horizontal jet grouting pile + top heading/two benches + temporary invert” method is applicable for cases in which there are strict requirements on the settlement control; 3) “large pipe roof support + top heading/bench + temporary invert” method is applicable for cases in between.

Key words: aeolian sand, tunneling, small duct, large pipe, horizontal jet grouting pile, temporary invert, settlement control