摘要:
单护盾TBM在国外很多工程中得到了成功的应用,而在国内的应用则极少。根据引洮供水一期工程总干渠7#隧洞首台单护盾TBM施工的实际情况,重点从工程地质条件、设备配置、辅助工作、施工组织管理等方面进行分析研究,提出为满足单护盾TBM快速掘进所需注意的问题,总结单护盾TBM快速掘进所需条件。
关键词: 单护盾TBM, 快速掘进, 工程地质, 设备配置, 辅助工作, 施工组织
Abstract:
Singleshield TBMs have been successfully used in many foreign countries, but there are few such cases in China. No. 7 tunnel of Phase I Works of Tao River Division Project in Gansu, China is bored by a singleshield TBM. In the paper, the construction of the tunnel is presented, and conditions for the rapid boring of singleshield TBM are analyzed in terms of geological conditions, equipment, assistant measures and construction organization.
Key words: singleshield TBM, rapid boring, engineering geological condition, equipment, assistant measure, construction organization
中图分类号:
U 45
阳斌. 单护盾TBM快速掘进条件分析[J]. 隧道建设, 2014, 34(10): 997-1000.
YANG Bin. Analysis on Conditions for Rapid Boring of Singleshield TBM[J]. Tunnel Construction, 2014, 34(10): 997-1000.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/ 10.3973/j.issn.1672-741X.2014.10.012
http://www.suidaojs.com/CN/Y2014/V34/I10/997