地铁暗挖车站风道与车站主体交叉段及马头门处系统锚杆与钢架联体支护技术

杨宏射   

  1. (中铁隧道集团二处有限公司, 河北 三河 065201)
  • 收稿日期:2014-02-13 修回日期:2014-06-13 出版日期:2014-09-20 发布日期:2014-09-22
  • 作者简介:杨宏射(1971—),男,陕西凤翔人,2007年毕业于长安大学,土木工程专业,本科,高级工程师,从事隧道工程施工技术工作。

Technology for Supporting Consisting of Systematic Bolts and Steel Arches  Applied in Construction of Ingate and Junction Section between  Ventilation Tunnel and Main Body of Metro Station

YANG Hongshe   

  1. (The 2nd Engineering Co., Ltd., China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2014-02-13 Revised:2014-06-13 Online:2014-09-20 Published:2014-09-22

摘要:

以“青岛地铁一期工程(3号线)土建03标的延安三路站施工”为例,指出“风道进入车站主体的马头门和交叉段”部位设计要求的方法施工将造成工期拖延,并且个别支护措施在施工中不易实现而且在后续施工中存在安全隐患,通过对原设计中“风道进入车站主体的马头门和交叉段”施工方法的优化、提出了“系统锚杆与钢架联体支护”的新方法,并在现场实际施工中取得了成功;进而对“系统锚杆与钢架联体支护”的改进使用进行了阐述,为同类工程施工及隧道支护提出了一种新思路。

关键词: 地铁, 暗挖车站, 风道与车站交叉段, 马头门, 锚杆, 钢架, 联体支护

Abstract:

In the construction of Yan’ansanlu station of Phase I project (Line 3) of Qingdao Metro, the construction duration would be prolonged, some support measures would be difficult to be realized and safety risks would exist in the following construction, if the ingate and the junction section between the ventilation tunnel and the main body of the Metro station were built in accordance with the original design. Therefore, the original design of the construction of the ingate and the junction section between the ventilation tunnel and the main body of the Metro station is optimized, a new support pattern consisting of systematic bolts and steel arches is proposed. The new support pattern proposed has been successfully applied in the construction of the Metro station mentioned. Furthermore, modification is proposed for the support pattern consisting of systematic bolts and steel arches so as to provide a new support concept for the construction of similar works and tunnels.

Key words: Metro, mined Metro station, junction section between ventilation tunnel and Metro station, ingate, systematic bolt, steel arch, combined support