• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (1): 92-96.DOI: 10.3973/j.issn.1672-741X.2016.01.014

• 施工技术 • 上一篇    下一篇

隧道偏压明洞错台成因及工程对策

陈国富   

  1. (上海同济建设工程质量检测站, 上海 200092)
  • 收稿日期:2015-08-03 修回日期:2015-09-24 出版日期:2016-01-20 发布日期:2016-02-01
  • 作者简介:陈国富(1981—),男,安徽泗县人,2006年毕业于合肥学院,土木工程专业,本科,工程师,主要从事隧道及地下结构工程监测、检测、病害调查与安全评估、加固养护工作。E-mail: chenguofufhfu@163.com。

Causes and Countermeasures for Lining Ring Dislocation of Asymmetricallypressured Cutandcover Tunnel

CHEN Guofu   

  1. (Shanghai Tongji Construction Quality Inspection Station, Shanghai 200092, China)
  • Received:2015-08-03 Revised:2015-09-24 Online:2016-01-20 Published:2016-02-01

摘要:

明洞衬砌结构对隧道工程安全运营起到至关重要的作用,衬砌发生错台会对隧道洞口结构安全产生严重影响。针对华东地区某公路隧道偏压明洞段衬砌错台等病害,采用现场调研和数值模拟相结合的方法分析其产生原因,并提出相应的对策。研究成果表明: 隧道错台主要与边坡坡体浅层土体的侧压力有关,建议对边坡进行位移监测和对边坡坡脚位置及抗偏压墙处采用反压回填法进行处治,实施效果较好,可为类似隧道病害的整治提供参考。

关键词: 隧道偏压, 明洞, 错台, 病害处理, 数值模拟, 反压回填法

Abstract:

The lining structure plays a vital role in the safe operation of cutandcover tunnels, and the dislocation of lining ring will affect the safety of the tunnel entrance structure. Based on the site investigation and numerical simulation, the causes and countermeasures for the dislocation of lining ring of an asymmetricallypressured cutandcover section of a tunnel in East China are analyzed in this paper. The study results show that the lining ring dislocation is mainly related to lateral pressure of soil on the slope. In addition, countermeasures, such as slope displacement monitoring and slope feet and asymmetricallypressured wall balanced backfilling, are suggested, and the results show that these countermeasures achieve good effect. The paper can provide reference for the similar projects in the future.

Key words: asymmetricallypressured tunnel, cutandcover method, lining ring dislocation, disease treatment, numerical simulation, balanced backfilling method

中图分类号: