胶州湾隧道浅埋分岔段的设计及施工关键技术

刘鹏   

  1. (中铁隧道勘测设计院有限公司, 天津 300133)
  • 收稿日期:2013-03-12 修回日期:2013-05-01 出版日期:2013-06-20 发布日期:2013-07-25
  • 作者简介:刘鹏 (1981— ),男,山东龙口人,2007年毕业于山东科技大学岩土工程专业,硕士,工程师,主要从事隧道及地下工程设计和研究工作。

Key Technologies for Design and Construction of Shallowcovered Forkedsection of Jiaozhou Bay Tunnel

LIU Peng   

  1. (China Railway Tunnel Survey & Design Institute Co.,Ltd.,Tianjin 300133, China)
  • Received:2013-03-12 Revised:2013-05-01 Online:2013-06-20 Published:2013-07-25

摘要:

在胶州湾隧道工程中,为满足城市交通规划和区域交通疏导要求,采取设置地下分流匝道的设计方案。双车道匝道隧道与3车道主隧道在地下小角度交汇,形成分岔隧道。由于该分岔隧道段埋深浅、地层条件差、地面环境复杂,给设计和施工带来了不小的难度。通过工程类比、数值模拟分析等方法确定小净距隧道段范围,对变净距并行隧道中夹岩分区段采取扩挖换填混凝土、对拉锚杆等措施;在特大断面隧道段通过预注浆加固地层、加强初期支护,采用台阶分块开挖方案;施工中采用微震爆破技术,较好地保护了围岩,最终成功实现了此浅埋分岔隧道的快速施工。通过现场监控量测数据反馈分析,所采取的支护参数、工程措施、施工方案合理,确保了工程的安全、顺利建成。

关键词: 胶州湾隧道工程, 分岔隧道, 小净距隧道, 特大断面隧道, 中夹岩加固, 微震爆破, 监控量测

Abstract:

A forked section is arranged in Jiaozhou Bay tunnel. Due to the shallow cover, poor geological conditions and complex ground surface environment of the forkedsection of the tunnel, there are great difficulties in the design and construction of the forkedsection. The range of the smallspaced tunnel section is determined by means of engineering analogy and numerical simulation. Concrete filling and tie bolts are adopted to reinforce the rock pillar of the smallspaced tunnel section. Pregrouting, primary support strengthening and bench excavating method are adopted for the large crosssection tunnel section. Microvibration blasting technology is adopted during the construction. In the end, rapid construction is achieved for the forkedsection. The monitoring results show that the support parameters, construction technologies and construction program adopted are rational and reliable.

Key words: Jiaozhou Bay tunnel, forked tunnel, smallspaced tunnel, large crosssection tunnel, rock pillar reinforcement, microvibration blasting, monitoring