• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2023, Vol. 43 ›› Issue (8): 1387-1395.DOI: 10.3973/j.issn.2096-4498.2023.08.013

• 规划与设计 • 上一篇    下一篇

基于运行速度的城市隧道出口与地面道路平交口理想衔接距离研究

刘计顺, 陈海军, 张聚文   

  1. (中铁隧道勘察设计研究院有限公司, 广东 广州 511458
  • 出版日期:2023-08-20 发布日期:2023-09-11
  • 作者简介:刘计顺(1989—), 男,山东滕州人,2017年毕业于西南交通大学,岩土工程专业,硕士,工程师,主要从事公路及城市道路设计工作。E-mail: liujishun1989@126.com。

Ideal Connecting Distance Between Exit of Urban Tunnel and Road Intersection Based on Running Speed

LIU Jishun, CHEN Haijun, ZHANG Juwen   

  1. (China Railway Tunnel Consultants Co., Ltd., Guangzhou 511458, Guangdong, China)
  • Online:2023-08-20 Published:2023-09-11

摘要:

隧道出口与地面道路衔接受诸多条件限制,目前相关规范给出的相应指标在某些条件下偏小,项目实际设计中简单套用相关规范指标不甚合理。依托衢州荷一路过江隧道工程,结合驾驶员角度基于运行速度建立隧道出口距地面道路平交口安全距离计算模型。《城市地下道路工程设计规范》要求的隧道接地点与下游道路平交口距离与本文提出的隧道出口距地面道路平交口安全距离一致,基本适用于有敞口段构造的城市隧道。对于无敞口段构造的城市隧道而言,困难情况下隧道出口距灯控平交口距离不能按照规范最小值1倍停车视距,应不小于1.5倍停车视距。此外,从驾驶员舒适度角度考虑,采用SIANAL94平交口车辆排队长度模型建立理想的隧道出口距地面道路平交口距离计算模型,得出当单车道车辆排队长度过长时相关规范指标不再适用,设计中应对有无敞口段的城市隧道区别处理,结合各向交通量车辆排队长度、车道数等计算项目所需的实际距离。最后,在衢州荷一路过江隧道工程设计过程中有针对性地提出优化衔接措施。

关键词: 城市隧道, 平交口, 运行速度, 安全距离, SIANAL94计算模型, 理想距离

Abstract: Various conditions can restrict the connection between tunnel exits and surface roads. Moreover, under certain conditions during the actual design of projects, the corresponding indexes given by relevant regulations are not rational. Therefore, a case study is conducted on the rivercrossing tunnel of the Heyi road in Quzhou, China. Based on the running speed from the aspect of drivers, a calculation model is established for the safety distance between the tunnel exit and the road intersection. The index requirements of the distance between the tunnelground connection point and the downstream road intersection in the WT5BXCode for Design of Urban Underground Road EngineeringWT5TNR》〗 are consistent with the safety distance between the tunnel exit and the road intersection proposed in this study, which is suitable for urban tunnels with opensection structures. For urban tunnels without an opensection structure, the distance between the tunnel exit and the lightcontrolled road intersection should not be less than 1.5 times the stopping sight distance, which is larger than that in the code(1 time). Furthermore, considering the driving comfort, the SIANAL94 intersection queuing length model is used to establish a model for calculating the ideal distance between the tunnel exit and the road intersection. It is concluded that when the queue length of a single lane is overly large, the relevant specifications are not applicable. The actual distance required by the project should be calculated according to various factors, such as the queue length of the traffic volume and the number of lanes. Finally, the optimized connection measures are proposed in the design of the rivercrossing tunnel of the Heyi road.

Key words: urban tunnel, road intersection, running speed, safety distance, SIANAL94 calculation model, ideal distance