隧道建设(中英文) ›› 2025, Vol. 45 ›› Issue (5): 1027-1040.DOI: 10.3973/j.issn.2096-4498.2025.05.018

• 典型工程 • 上一篇    下一篇

Key Technologies for Super-Long Highway Tunnels in Very Cold and High-Altitude Regions: A Case Study on Shengli Tunnel Crossing Tianshan Mountain in Xinjiang, China(高寒高海拔超长公路隧道建设关键技术——以天山胜利隧道为例)

彭文波1, 高翔2, 刘继国1, 郑聪1, 蹇宜霖1   

  1. 1. 中交第二公路勘察设计研究院有限公司, 湖北 武汉 4300562. 陕西交通职业技术学院, 陕西 西安 710018
  • 出版日期:2025-05-20 发布日期:2025-05-20
  • 作者简介:彭文波(1981—),男,湖北天门人,2015年毕业于武汉大学,建筑与土木工程专业,硕士,正高级工程师,主要从事隧道与地下工程设计与研究工作。E-mail: 15871744068@139.com。

Key Technologies for Super-Long Highway Tunnels in Very Cold and High-Altitude Regions: A Case Study on Shengli Tunnel Crossing Tianshan Mountain in Xinjiang, China

PENG Wenbo1, GAO Xiang2, LIU Jiguo1, ZHENG Cong1, JIAN Yilin1   

  1. (1. CCCC Second Highway Consultants Co. Ltd., Wuhan 430056, Hubei, China; 2. Shaanxi College of Communications Technology, Xi′an 710018, Shaanxi, China)

  • Online:2025-05-20 Published:2025-05-20

摘要: 在建乌鲁木齐至尉犁高速公路天山胜利隧道全长22.1 km,是世界最长的高速公路隧道。该隧道自南向北穿越天山山脉,建设面临复杂的工程地质和水文地质条件、恶劣的高寒高海拔环境、高地震烈度及严格的环保要求,且国内外尚无20公里级高速公路隧道建设案例,隧道结构安全和运营安全面对诸多技术难题。结合隧道特征、建设环境及水文地质条件,开展隧道长距离水平定向钻勘探、总体方案比选、压注工法双模式TBM设计、活动性断层抗震设计、防灾救援和健康运维等重大工程方案研究。勘探方面,采用机载三维激光扫描测量、高精度遥感、长距离水平定向钻勘测技术快速精确获取地质参数、缩短勘测周期; 设计方面,采用双行车隧道+服务隧道总体设计方案、压注工法双模式TBM设计方案提升隧道施工运营安全、缩短施工工期,采用活动性断层结构抗震设计方案、洞内消防水池设计方案提升隧道结构韧性; 运维方面,采用隧道智慧防灾救援和健康运维方案、光环境品质提升技术,提高隧道运营安全及品质,实现秒级报警,即时响应,5 min应急值班室人员到达事故现场快速救援。

关键词: 天山胜利隧道, 抗震设计, 水平定向钻, 压注工法双模式TBM, 防灾救援

Abstract: With 22.1 km length, the Shengli tunnel crossing Tianshan mountain ("Shengli tunnel" in short) on Urumqi-Yuli highway under construction is the longest highway tunnel in the world. The tunnel crosses Tianshan mountain from the south to the north. The construction of the tunnel is faced with complex engineering geological conditions and hydrogeological conditions, very cold and high-altitude environment, high seismic intensity and strict environmental protection requirements. So far, there is no completed highway tunnel with up to 20 km length in China and abroad. The tunnel is faced with many technical challenges in terms of the structural safety and the operation safety. Critical aspects of the tunnel, such as exploration by means of the long-distance horizontal directional drilling, determination of the overall tunnel pattern, design of dual-mode TBMs with injected concrete lining function, aseismic design of the tunnel sections in active fracture zones, disaster prevention and rescue, and health monitoring, operation and maintenance, are studied on basis of the features, construction environment and hydrogeological conditions of the tunnel. In terms of the prospecting and surveying for the tunnel, 3D UAV laser scanning surveying technology, high-precision remote sensing technology and longdistance horizontal directional drilling exploration technology are used to quickly and accurately obtain the geological parameters and to shorten the prospecting and surveying period; in terms of the design of the tunnel, the overall pattern of "twin main tunnel tubes + one service tunnel tube" and the design of dual-mode TBMs with injected concrete lining function are adopted to improve the safety during the construction and operation of the tunnel and to shorten the construction period, and the aseismic design of the tunnel sections in the active fracture zones and the design of the underground high-position fire-fighting water tanks are adopted to improve the toughness of the tunnel structure; in terms of the operation and maintenance of the tunnel, intelligent disaster prevention and rescue, intelligent tunnel health monitoring, intelligent tunnel operation, intelligent tunnel maintenance, and illumination scenery in the tunnel are adopted to improve the safety and quality of the tunnel operation, realizing alarming within seconds, responding immediately and the emergency on-duty persons arriving at the accident position within five minutes so as to perform timely rescue.

Key words: Shengli tunnel crossing Tianshan mountain ("Shenli tunnel" in short), aseismic design, horizontal directional drilling, dual-mode TBM with injected concrete lining function, disaster prevention and rescue