隧道建设(中英文) ›› 2026, Vol. 46 ›› Issue (9): 1885-1903.DOI: 10.3973/j.issn.2096-4498.2026.09.006

• 研究与探索 • 上一篇    下一篇

基于LCA的浅覆土综合管廊U型盾构与明挖施工碳排放及环境影响对比——以雄安新区EA4标段工程为例

张洪军1, 2, 赵家伟3, 4, *, 王树旺5, 宋战平3, 4, 徐宏2, 董志伟5, 户若琪3, 4   

  1. (1. 中铁一局集团第二工程有限公司, 河北 唐山 063004; 2. 中铁一局集团有限公司, 陕西 西安 710000;3. 西安建筑科技大学土木工程学院, 陕西 西安 710055; 4. 陕西省岩土与地下空间工程重点实验室,陕西 西安 710055; 5. 中国中铁股份有限公司雄安分公司, 河北 雄安 071800)
  • 出版日期:2026-09-20 发布日期:2026-09-20
  • 作者简介:张洪军(1977—),男,吉林德惠人,2022年毕业于西北工业大学,土木工程专业,本科,高级工程师,现从事土木工程领域的技术管理与研究工作。 E-mail: zhanghongjun2026@163.com。*通信作者: 赵家伟, E-mail: 13150461482@163.com。

Comparative Life Cycle Assessment of Carbon Emissions and Environmental Impacts From U-Shaped Shield Tunneling and Cut-and-Cover Construction of Shallow-Buried Utility Tunnels: A Case Study of EA4 Bid Section Project in Xiong’an New Area

ZHANG Hongjun1, 2, ZHAO Jiawei3, 4, *, WANG Shuwang5, SONG Zhanping3, 4, XU Hong2, DONG Zhiwei5, HU Ruoqi3, 4   

  1. (1. The Second Engineering Co., Ltd. of China Railway First Group, Tangshan 063004, Hebei, China; 2. China Railway First Group Co., Ltd., Xi’an 710000, Shaanxi, China; 3. School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an 710055, Shaanxi, China; 4. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi’an 710055, Shaanxi, China; 5. China Railway Group Limited Xiongan Branch, Xiong’an 071800, Hebei, China)
  • Online:2026-09-20 Published:2026-09-20

摘要: 针对“双碳”目标下浅覆土综合管廊施工工法低碳优选缺乏定量依据的问题,以雄安新区EA4标段工程为依托,基于生命周期评价(life cycle assessment,LCA)理论构建了涵盖人工、材料和机械投入的施工阶段碳排放核算模型,并以1延米综合管廊为功能单位,对U型盾构法(简称U盾法)与明挖法的碳排放强度、排放结构及环境影响进行对比分析。进一步结合EDIP2003、TRACI2.1、BEES+评价方法,对边坡支护、主体结构和防水阶段的全球变暖潜势(GWP)、酸化潜势(AP)和富营养化潜势(EP)进行综合评价。结果表明: 1)U盾法单位里程碳排放量为17 129.14 kgCO2/m,较明挖法的53 720.60 kgCO2/m降低68.11%,减排优势显著;2)U-盾法碳排放以材料隐含碳为主,明挖法以机械直接排放为主,两者排放主控环节存在显著差异; 3)分阶段环境影响分析表明,U盾法在边坡支护和防水阶段整体环境负荷较低,但主体结构阶段因高强材料投入,其GWP、AP和EP均高于明挖法,表现出环境负荷由施工现场向材料生产阶段转移的特征; 4)总体上,U盾法在浅覆土条件下通过减少土方开挖、临时支护和高强度机械作业,获得了优于明挖法的综合环境绩效。

关键词: 综合管廊, 浅覆土, U盾法, 明挖法, 碳排放, 生命周期评价, 环境影响评价

Abstract: A case study is conducted on the EA4 Bid section project in Xiong’an New Area to address the lack of a quantitative basis for low-carbon optimization of shallow-buried utility tunnel construction methods under the “carbon peaking and carbon neutrality” goals. Additionally, a carbon emission calculation model covering labor, materials, and machinery inputs during the construction phase is established based on life cycle assessment theory. Using one linear meter of the utility tunnel as the functional unit, this study compares the carbon emission intensity, emission structure, and environmental impact of the U-shield method and the cut-and-cover method. Furthermore, three evaluation methods—EDIP2003, TRACI2.1, and BEES+—are integrated to comprehensively evaluate the global warming potential (GWP), acidification potential (AP), and eutrophication potential (EP) of the slope protection, main structure, and waterproofing stages. The main findings are as follows: (1) The unit carbon emissions of the U-shield method reaches 17 129.14 kgCO2/m, which is 68.11% lower than those of the cut-and-cover method at 53 720.60 kgCO2/m, demonstrating a substantial carbon mitigation advantage. (2) The carbon emissions of the U-shield method are dominated by embodied carbon associated with construction materials. Conversely, the emissions from the cut-and-cover method are mainly attributable to direct emissions from construction machinery, indicating considerable differences in the dominant emission-contributing processes between the two methods. (3) The stage-based environmental impact assessment shows that the U-shield method results in a lower overall environmental burden during the slope support and waterproofing stages. However, during the main structural construction stage, its GWP, AP, and EP are higher than those of the cut-and-cover method because it uses higher-strength materials, shifting environmental burdens from onsite construction activities to upstream material production. (4) Under shallow overburden conditions, the U-shield method outperforms the cut-and-cover method by reducing earthwork excavation, temporary support requirements, and high-intensity mechanized construction operations.

Key words: utility tunnel, shallow overburden, U-shield method, cut-and-cover method, carbon emissions, life cycle assessment, environmental impact assessment