ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (增刊2): 44-46.DOI: B
• wenzhang • Previous Articles Next Articles
CENG Wei-Hua
Received:
Revised:
Online:
Published:
Abstract:
aking the shield boring through Shougouling fractured zone in TianHua running tunnel of line 3 of Guangzhou Mass Rapid Transit system as example, the author presents the difficulties encountered during the tunnel boring, including buildings protection, mud cakes, water gushing, chamber pressure control and cutting tool damages. Furthermore, the author also provides the corresponding countermeasures.
Key words: unning tunnel shield boring  , fractured zone  , difficulties  , countermeasures
CLC Number:
U455.43
CENG Wei-Hua. Construction Technology for Shield Boring through Fractured Zones[J]. Tunnel Construction, 2006, 26(增刊2): 44-46.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I增刊2/44
Current Situation and Development of Causes of Secondary Lining Crack in Loess Tunnel and Countermeasures
Surrounding Rock of Haidong Water Conveyance Tunnel of Central Yunnan Water Diversion Project: Risks and Countermeasures
for Using Ordinary Prestressed Anchor Cables
Research on Construction Risks and Countermeasures of Piperoof Undercutting Method in Saturated Soft Soil