ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2006, Vol. 26 ›› Issue (增刊2): 47-49,84.DOI: B

• wenzhang • Previous Articles     Next Articles

Tunnel Boring across underneath Highspeed Railways by Shield Machines

LIU Yang-Cheng   

  1. Guangzhou Municipal DunJian Underground Construction Engineering Co., Ltd., Guangzhou 510030, China
  • Received:2006-10-31 Revised:2006-11-23 Online:2006-12-18 Published:2010-01-08

Abstract:

The tunnel boring across underneath the tracks of highspeed railways by shield machines is presented in the paper, with the emphasis being placed on the works conditions, construction difficulties and countermeasure taken in respect of manpower, materials, equipment, boring parameter design and monitoring. The results demonstrate that, with the mentioned countermeasures, the surface subsidence has been effectively controlled and the safety of the railway has been guaranteed.

Key words: Metro  , shield machine boring across underneath highspeed railway  , construction countermeasure subsidence control

CLC Number: