ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (增刊2): 47-49,84.DOI: B
• wenzhang • Previous Articles Next Articles
LIU Yang-Cheng
Received:
Revised:
Online:
Published:
Abstract:
The tunnel boring across underneath the tracks of highspeed railways by shield machines is presented in the paper, with the emphasis being placed on the works conditions, construction difficulties and countermeasure taken in respect of manpower, materials, equipment, boring parameter design and monitoring. The results demonstrate that, with the mentioned countermeasures, the surface subsidence has been effectively controlled and the safety of the railway has been guaranteed.
Key words: Metro  , shield machine boring across underneath highspeed railway  , construction countermeasure subsidence control
CLC Number:
 
U455.43
LIU Yang-Cheng. Tunnel Boring across underneath Highspeed Railways by Shield Machines[J]. Tunnel Construction, 2006, 26(增刊2): 47-49,84.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I增刊2/47