Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊1): 76-79.DOI: B
• wenzhang • Previous Articles Next Articles
MA Xiang-Yang
Received:
Revised:
Online:
Published:
Abstract:
On basis of the problems in the material management of construction works and the experience in material management, the author analyzes the factors affecting the material management in the job site, recommends some countermeasures to improve the material management and to minimize the construction cost and tries to establish a series of effective material management methods.
Key words: construction works  , material  , management  , problem countermeasure
CLC Number:
U454
U455.1
MA Xiang-Yang. Countermeasures for Problems in Material Management of Construction Works[J]. Tunnel Construction, 2007, 27(增刊1): 76-79.