| [1] |
YANG Ping, LI Jinghao, ZHANG Ting.
Application Status and Prospects of Artificial Ground Freezing Technology in China
[J]. Tunnel Construction, 2026, 46(5): 895-918.
|
| [2] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [3] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [4] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|
| [5] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [6] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [7] |
ZHU Yeting, ZHAO Jian, BI Xiangli, ZHU Yanfei, YU Ning, WANG Xiuzhi, HUANG Dezhong, QIN Yuan.
Engineering Verification of Parallel Control Technology for Automatic Shield Tunneling and Segment Assembly
[J]. Tunnel Construction, 2025, 45(8): 1602-1614.
|
| [8] |
ZHU Yeting, BI Xiangli, ZHU Yanfei, YU Ning, WU Di, QIN Yuan, WANG Zhihua, JIANG Haibo.
Retrofit and Engineering Practice of Automatic Tunneling Attitude Control for Existing Metro Shield Machines
[J]. Tunnel Construction, 2025, 45(7): 1378-1386.
|
| [9] |
NI Jiaze, LI Xiang, ZHANG Jinzhang, HUANG Hongwei.
Structural Safety Risk Analysis of Subsea Tunnels Crossing Fault Zones in Jiaozhou Bay Second Subsea Tunnel
[J]. Tunnel Construction, 2025, 45(12): 2287-2297.
|
| [10] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [11] |
LIU Xingen, WANG Bozhi, LIU Xiaodi.
Track Deviation Correction Method of Shield Based on
Space S-Curves
[J]. Tunnel Construction, 2023, 43(S1): 457-463.
|
| [12] |
HU Min, PEI Liefeng, WU Bingjian, SUN Junchao, LU Jing.
Current Situation and Prospect of Shield Automatic
Driving Technology
[J]. Tunnel Construction, 2023, 43(3): 383-391.
|
| [13] |
HU Changming, FENG Lili, LI Liang, YU Xiangtao, LI Zengliang.
Surface Settlement Control and Parameter Optimization
of Shield Tunneling Based on Machine Learning
[J]. Tunnel Construction, 2023, 43(12): 1985-1995.
|
| [14] |
WANG Jinfeng, XIE Qiyong, XU Jinbin, LI Jieyuan, WANG Pan.
Micro Settlement Control Technology for Shield Tunnel
Closely Crossing Underneath Existing Metro Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 372-380.
|
| [15] |
YANG Hui, PEI Junhao, ZHU Jibin, LIU Ning, JIANG Xiaobo, LAI Qingzhao.
Construction Safety Technology of ShallowBuried
LargeCrossSection Tunnel Portal Crossing Underneath Operational Highway
[J]. Tunnel Construction, 2022, 42(S2): 440-448.
|