ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊1): 69-72.DOI: B
• wenzhang • Previous Articles Next Articles
CHEN Shan-Dong
Received:
Revised:
Online:
Published:
Abstract:
According to engineering geological conditions and hydrologic conditions at the bottom of the river and construction characteristic of river-crossing tunnel, the mode of shield machine for river-crossing tunnel construction and fundamental configuration requirements are put forward. Meanwhile, a discussion on the selection of soil water balance shield machine and cutter heads configuration has also been made.
Key words: model selection of shield machine, soil water shield machine, river-crossing
CLC Number:
U 455.3+9
CHEN Shan-Dong. Model Selection of Shield Machine for River-crossing Metro Tunnel[J]. Tunnel Construction, 2009, 29(增刊1): 69-72.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊1/69