ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊2): 148-152,170.DOI: B
• wenzhang • Previous Articles Next Articles
ZHOU Guolong
Received:
Revised:
Online:
Published:
Abstract:
Heluoshan tunnel, one of the control works on DaliLijiang railway, has such geological disasters as water and mud gushing. The principle of "taking water sealing as dominant measure and releasing the water with limitation" is determined on basis of the actual situation of the sudden water gushing in one steep inclined shaft of Heluoshan tunnel. Detailed technical parameters and methods of fullface pregrouting are established and adopted and satisfactory effects are achieved. The details of the fullface pregrouting are presented in the paper, which can provide reference for similar projects in the future.
CLC Number:
U 455.4
ZHOU Guolong. Fullface Pregrouting to Control Sudden Water Gushing in Steep Inclined Shaft of Heluoshan Tunnel[J]. Tunnel Construction, 2009, 29(增刊2): 148-152,170.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊2/148