Abstract:
During the arriving of the shield of Anqing Yangtze River Crossing Tunnel on the gas transmission pipeline from Sichuan Province to East China, countermeasures such as sand backfilling and water filling are taken so as to simulate shield boring under rivers and satisfactory effect has been achieved. The shield arriving technology applied in the project is presented in the paper. The technology is applicable to cases such as poor geological conditions of shield arriving shaft, huge covers, poor reinforcement of the strata and water/sand inflows that can not be coped with by grouting. The paper can provide reference for similar works in the future.
Key words: shield, sand backfilling, water filling, simulation of boring under river
ZHOU De-Wu. Shield Arriving by Simulating Boring under River[J]. Tunnel Construction, 2010, 30(5): 565-568.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I5/565
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel