Tunnel Construction ›› 2011, Vol. 31 ›› Issue (3): 278-283.
• wenzhang • Previous Articles Next Articles
LI Tao1, LIU Jiqiang2, YIN Wenping1
Received:
Revised:
Online:
Published:
Abstract:
3D numerical simulation analysis by means of finite element and fluidsolid coupling methods is made for the dewatering and excavation of a vertical shaft of a running tunnel of Shenzhen Metro Line 5 constructed by mining method, so as to assess the ground surface settlement induced by the sinking of the vertical shaft. The variations and distributions of ground surface settlement induced by dewatering and excavation of the vertical shaft are obtained. Conclusions drawn are as follows: 1) The ground surface settlement induced by the excavation of the vertical shaft without dewatering is far smaller than that induced by the coupling effect of dewatering and excavation of the vertical shaft; 2) The closer the measurement points to the vertical shaft, the larger the ratio of the ground surface settlement induced by excavation in the total value; the farther the measurement points to the vertical shaft, the larger the ratio of the ground surface settlement induced by dewatering in the total; 3) At the position with the larest ground surface settlement, the settlement induced by dewatering occupies 65% of the total.
Key words: Metro tunnel, shaft sinking, dewatering, settlement, numerical simulation
LI Chao, LIU Ji-Jiang, YIN Wen-Beng. Analysis on Ground Surface Settlement Induced by Dewatering and Excavation of Vertical Shaft of Metro Tunnel Works[J]. Tunnel Construction, 2011, 31(3): 278-283.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I3/278
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Noise Propagation Characteristics of Tunnel Construction by Drilling and Blasting Method