| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
HUANG Hongwei, YIN Zhenyu, CHANG Jiaqi.
Research and Application of Embodied Intelligence Framework in Controlling Shield Tunneling Parameters and Environmental Disturbances
[J]. Tunnel Construction, 2026, 46(S1): 52-66.
|
| [3] |
FENG Tugen, YUE Chenlong, ZHANG Jian, HU Jinjian, XUE Xinkai, ZHENG Bin.
Performance Improvement of Shield Tunneling by Integrating Machine Learning and Multi-Objective Optimization
[J]. Tunnel Construction, 2026, 46(S1): 67-77.
|
| [4] |
ZHOU Zehua, XU Youliang, JIN Baocheng, CHU Maocheng, ZHAO Xiaoyong, LU Xing’an.
Risk Identification of TBM Traversing Soft Rock Deformation Sections Based on Attention Convolutional Neural Network-Long Short-Term Memory Model
[J]. Tunnel Construction, 2026, 46(S1): 236-248.
|
| [5] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [6] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [7] |
LI Qingmin, WANG Huawei, ZHAO Zhendong, LIU Sijin, YANG Chengxi, SHI Shuo.
Fault Diagnosis of TBM Electric Drive Systems Based on an Adaptive Sparse Fusion Network
[J]. Tunnel Construction, 2026, 46(9): 1825-1836.
|
| [8] |
SONG Qiyu, ZHANG Mengxi, YU Jingxiang, WU Huiming, ZHENG Yiming.
Transverse Surface Settlement Prediction in Shield Tunneling Based on a Multi-Fidelity Residual Neural Network
[J]. Tunnel Construction, 2026, 46(9): 1950-1964.
|
| [9] |
CHEN Shaolin, XIAO Jing, XU Chao, ZHENG Jiajia, XU Huaguo.
Experimental Study on Rock Breaking by Triple-Disc Cutters With Different Cutter Profiles
[J]. Tunnel Construction, 2026, 46(8): 1640-1649.
|
| [10] |
WANG Xuyang, YANG Quyuan, JIN Dalong, SHEN Xiang, YUAN Dajun.
Development and Application of an Experimental Platform for Attitude Control in Shield Tunneling
[J]. Tunnel Construction, 2026, 46(8): 1659-1675.
|
| [11] |
LIU Binyuan, LUO Yanbin, TAN Chang, YANG Zhenxing, LYU Qianqian, CHEN Zhigang, LIU Weiwei.
Research and Application of a Real-Time Intelligent Early Warning Model for TBM Jamming Risk Based on Transformer Multi-Task Learning
[J]. Tunnel Construction, 2026, 46(8): 1729-1739.
|
| [12] |
HUANG Weiran, LUO Shuyi, JU Shijian, ZHU Weibin.
Engineering Practice and Innovation in Shield Tunneling Through Pearl River Delta Water System
[J]. Tunnel Construction, 2026, 46(8): 1800-1824.
|
| [13] |
ZHAO Dongping, PENG Yuelei, TANG Changsen, YANG Hongwei, FENG Xulin.
Spatiotemporal Distribution Patterns of Dust Concentration and Dust Removal Test in Tunnel Excavation by Integrated Excavation and Support Machine
[J]. Tunnel Construction, 2026, 46(6): 1159-1170.
|
| [14] |
WANG Jiannan, WANG Chunhua, REN Fuqiang, LI Qingsong, LIU Huaiqian, MA Qing, LIU Hao, SONG Xin, WANG Jie, LIN Yichao.
Seepage Pressure and Deformation of Surrounding Rock in Double-Shield TBM Tunnels in Water-Rich Fractured Ground: A Fluid-Solid Coupling Analysis
[J]. Tunnel Construction, 2026, 46(6): 1244-1253.
|
| [15] |
YAO Zhanhu, WANG Xuenan, ZHANG Yazhou, ZHANG Lei, LU Mingfei, WANG Yisheng, YANG Nan.
Engineering Application of Low-Temperature-Resistant Self-Compacting Concrete for Steel Shells During Shield-Tunnel Docking
[J]. Tunnel Construction, 2026, 46(6): 1317-1329.
|