| [1] |
LIU Jiguo, LIU Xialin, WEI Longhai, SONG Yujia.
Application of Horizontal Directional Drilling-Based Refined Tunnel Geological Investigation
[J]. Tunnel Construction, 2025, 45(9): 1719-1727.
|
| [2] |
HE Junyuan, LIANG Di, YANG Guihua, HE Shiyong, LAI Zhongyu, ZHANG Chaoyu, WANG Wei, ZENG Meiting, WANG Sheng.
Prediction of Water Inrush
Risk Level Based on a Convolutional Neural Network-Long Short-Term Memory Network Hybrid Model for Karst Tunnels: A Case Study of Wufu Tunnel
[J]. Tunnel Construction, 2025, 45(6): 1131-1141.
|
| [3] |
CHEN Minghao, ZHOU Hang, QIU Peng, XU Zhengxuan, LI Dong, SU Peidong, ZHOU Xiaohan.
Gas Grade Evaluation Method for Noncoal Stratum
Tunnels
[J]. Tunnel Construction, 2025, 45(5): 895-905.
|
| [4] |
LI Guoliang, HU Weifeng, LIU Jia, LI Sihan, YE Fei, YANG Yong.
Slope Landslide Mechanism and Stability Control
Technology of Filled Karst Tunnels: A Case Study of Xiaba Tunnel Exit Section of XunchangYuhe Highway in Yibin, China
[J]. Tunnel Construction, 2024, 44(2): 274-281.
|
| [5] |
PENG Shaoyong, FENG Shichun, XU Han.
Hazard Assessment Model for Water and Mud Inrush in Karst Tunnel Based on Interval Number Theory
[J]. Tunnel Construction, 2023, 43(S2): 100-106.
|
| [6] |
LI Lei, SHAO Zhizhong, JIANG Hui, YAO Qifa.
Improvement and Application of Tunnel Seismic
Tomography and Complex Frequency Conductivity Technology in Advance
Geological Prediction
of
SegmentAssembled Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 321-329.
|
| [7] |
CHEN Yu, LIU Mingwei, ZENG Zhifa, CHEN Dunli.
Development and Application of a ThreeDimensional
Automatic Detection Equipment for Tunnel Transient Electromagnetic Based
on
Angle Rotation Control Platform
[J]. Tunnel Construction, 2023, 43(S1): 289-297.
|
| [8] |
ZHANG Xuefu, GUAN Shaojie, XIAO Yuhan, LIU Shiyang, CHEN Yuchi, WANG Cheng.
Experiment on Crystallization Blockage Prevention of
Karst Tunnel Geotextiles Based on Hydrophilic Surface
Modification
[J]. Tunnel Construction, 2023, 43(6): 929-935.
|
| [9] |
WANG Zhijian, TONG Jianjun.
Overview and Prospect of Researches on Intelligent Engineering Technologies for Tunnels Constructed by Drilling-and-Blasting Method
[J]. Tunnel Construction, 2023, 43(4): 529-548.
|
| [10] |
SUN Xingliang, GUO Xuke, SI Nan.
Effects of PipeType Hidden Caverns on Tunnel
Lining Structure Under Strong Rainfall Conditions
[J]. Tunnel Construction, 2023, 43(11): 1831-1841.
|
| [11] |
ZHANG Xuefu, WANG Cheng, XIAO Yuhan, LIU Shiyang, CHEN Xiangge.
Laboratory Test Research on Crystallization of
Geotextiles for Tunnel Drainage System
[J]. Tunnel Construction, 2022, 42(S2): 59-68.
|
| [12] |
HUANG Mingli, JIANG Bo, WANG Chenglin, GUAN Qiang.
FullScale Model Tests on Water Pressure
Resistance of Karst Tunnel Lining Structure: a Case
Study of New Yuanliangshan Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 48-55.
|
| [13] |
TIAN Xuehao, KANG Jia′an, JIANG Shuai, YU Peng, FU Kaiyong.
Research on Geological Prediction System of Rock
Drilling Jumbo Based on
Least Squares Support Vector Machine
[J]. Tunnel Construction, 2022, 42(S1): 267-273.
|
| [14] |
ZHAO Shaozhong, HUANG Xin, XU Zhenhao, LI Minghai.
Development Characteristics and Treatment Techniques
of Karst Caves in Qiyueshan Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1289-1299.
|
| [15] |
LIU Guoqiang, LIU Bin, ZHANG Qingming, ZHANG Ruilin, HUANG Feng, TONG Xiaodong.
Parameter Optimization of Smooth Blast in Karst Tunnel
and Its Application
[J]. Tunnel Construction, 2021, 41(S2): 50-57.
|