ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (增刊): 213-216.DOI: 10.3973/j.issn.1672-741X.2014.S.034
Previous Articles Next Articles
WU Qiong, LI Li
Received:2014-02-21
Revised:2014-07-07
Online:2014-08-15
Published:2014-08-11
CLC Number:
WU Qiong, LI Li. Case Study on Design of Combination of Cutandcover Metro Station and Tower Structure[J]. Tunnel Construction, 2014, 34(增刊): 213-216.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.S.034
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn