ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2014, Vol. 34 ›› Issue (8): 790-796.DOI: 10.3973/j.issn.1672-741X.2014.08.014

Previous Articles     Next Articles

Study on Localization of Main Drive Reducers of Shield

LIU Jinxiang1,2, CHEN Kui2, SUN Shangzhen3, FENG Huanhuan2   

  1. (1. Tunneling Dedicated Equipment Center of China Railway Tunnel Group,Luoyang 471009,Henan,China; 2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 3. Bengbu Xingxing Construction Machinery Co., Ltd., Bengbu 233010, Anhui, China)
  • Received:2014-04-03 Revised:2014-06-10 Online:2014-08-20 Published:2014-08-21

Abstract:

The localization of shield is of great necessity for China. In this paper, thestateoftheart of the development of the main drive reducers of shield in China and abroad is presented, and study is made on the localization of the main drive reducers of shield in China. The fault phenomenon of the main drive reducers of LOVAT 246 shield is summarized and analyzed, and study is made on the localization of the reducers in terms of material selection, gear modulus and dimension selection and bearing optimization. The trial of the prototype shield with the developed reducers proves that the reducers developed can meet the requirements of the normal shield tunneling completely. The study on the localization of the main drive reducers of shield has great significance in improving the shield technology.

Key words: shield, main drive reducer, localization, optimization design

CLC Number: