| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
CUI Yuzhang, ZHU Weibin, MI Jinsheng.
Evolution Pattern and Stress Analysis of Frozen Wall Under Cavity-Type Freezing Steel Segment
[J]. Tunnel Construction, 2026, 46(S1): 146-152.
|
| [3] |
HU Jianjun, GONG Min, ZHANG Rubo, WU Xiaodong, ZHANG Pinghua, ZHANG Tao, PENG Guoqing, WU Lijun.
Calculation Method for In-Hole Segmented Control Blasting Delay Parameters of Underground Cavern Deep-Hole Bench Based On Electronic Detonators
[J]. Tunnel Construction, 2026, 46(S1): 226-235.
|
| [4] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [5] |
WU Haosheng, LIU Jianguo, FU Yi, ZHANG Jianqiang, GUO Zhihui, ZHANG Ming, MULATI· Jueraiti, ZENG Lingjiang, DU Jiaxin, LIU Tuojiang.
Development and Field Testing of Tunnel/Roadway Blasting-Induced CO Photocatalytic Purification Device
[J]. Tunnel Construction, 2026, 46(S1): 361-374.
|
| [6] |
ZHOU Chuanchuan, XIA Wenjie, WANG Jihong, JIANG Shuang, WANG Shugang, WU Yuanjin, LUO Zhanfu, LIU Qijun.
Optimal Deployment of CO Monitoring Sensors for Blasting Operations in Drill-and-Blast Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 519-528.
|
| [7] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [8] |
SHI Yufeng, ZHOU Xiancheng, YAN Su, ZHU Jiangwei, FENG Zhiyao, XIA Junmin.
Mechanical Behavior of Tunnel Linings Subjected to Combined Defects Involving Voids and Thinning
[J]. Tunnel Construction, 2026, 46(S1): 564-574.
|
| [9] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [10] |
TANG Langzhou, WU Lei, ZHENG Li, YU Li, CUI Zhen.
Theoretical Calculation Method for Seismic Analysis of Double-Arch Tunnels Under Near-Fault Ground Motions
[J]. Tunnel Construction, 2026, 46(9): 1916-1933.
|
| [11] |
LI Tengfei, LI Hongbing, ZHOU Zilong, YANG Zhilong, ZHANG Chengjiao, LENG Zhendong, TIAN Shuilong.
Borehole-Wall Pressure Calculation and Damage Mechanism of Tunnel Smooth Blasting Using Bulk Explosives With Eccentric Charging
[J]. Tunnel Construction, 2026, 46(9): 1934-1949.
|
| [12] |
ZHAO Rui, LI Shuchen, WAN Ze’en, YU Chenyu.
Rheological Properties Testing of Shield-Tail Seal Grease and Failure Mechanisms of Shield-Tail Breakdown
[J]. Tunnel Construction, 2026, 46(9): 1965-1979.
|
| [13] |
YANG Chunshan, YU Zhiyuan, LI Yadong, LIN Zhiwei.
Mechanical Characteristics of Supporting Structures for Deep Foundation Pits of Immersed Tunnels With Limited Soil and Unilateral Water-Adjacent Cofferdams
[J]. Tunnel Construction, 2026, 46(9): 1990-2000.
|
| [14] |
LU Hailiang, ZHOU Zhicheng, LIU Jingsheng, SONG Zhanping, HUA Bo, HU Ruoqi.
Calculation Method and Evolution Mechanism of Thrust for a U-Shield Pipe-Erecting Machine
[J]. Tunnel Construction, 2026, 46(9): 2024-2036.
|
| [15] |
FENG Jiacheng, HAN Tao, SUN Yunjia, LYU Yingxue, SONG Yue.
Hydrodynamic Response of an Adjustable-Draft Submerged Barge for Immersed-Tunnel Construction
[J]. Tunnel Construction, 2026, 46(8): 1775-1787.
|