ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (3): 279-284.DOI: 10.3973/j.issn.1672-741X.2015.03.015
Previous Articles
WANG Guozheng, WANG Guotao
Received:
Revised:
Online:
Published:
Abstract:
A test bench is developed for the rock breaking system of tunnel boring machines, so as to provide cutting tools suitable for the specific geological conditions. In the paper, the electrical control system of the test bench is presented in detail. The electrical control system is composed of console and PC. Profibus bus control mode is adopted and precise control is realized by means of proportional valves, magnetic valves, etc. The design concept and test results of the power supply and distribution system, PLC control system and data acquisition system are studied and presented with emphasis. The test result shows that the control system is reliable and practical.
Key words: test bench, PC, power supply and distribution, tunnel, tunnel boring machine, cutting tool, rock breaking, electrical system
CLC Number:
U 455.3+9
WANG Guozheng, WANG Guotao. Development of Electrical Control System of Test Bench of Rock Breaking System of Tunnel Boring Machines[J]. Tunnel Construction, 2015, 35(3): 279-284.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.03.015
http://www.suidaojs.com/EN/Y2015/V35/I3/279
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station