ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (9): 928-934.DOI: 10.3973/j.issn.1672-741X.2015.09.011
Previous Articles Next Articles
CAI Hui
Received:
Revised:
Online:
Published:
Abstract:
Ground conditioning is paramount for successful EPB tunneling in sand strata. Additives like bentonite slurry, foam and polymer are commonly used for ground conditioning in various sand strata, so as to guarantee safe and smooth tunneling. In the paper, the problems encountered during shield tunneling in sand strata in Nanchang, Zhengzhou and Xi’an are presented and the ground conditioning technologies used are described. The ground conditioning measures for shield tunneling in sand strata are summarized, and the stateofart of ground conditioning technology is discussed.
Key words: EPB shield, and strata, round conditioning, dditives
CLC Number:
U 45
CAI Hui . Ground Conditioning Technology for EPB Shield Tunneling in Sand Strata[J]. Tunnel Construction, 2015, 35(9): 928-934.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.09.011
http://www.suidaojs.com/EN/Y2015/V35/I9/928
Experimental Study on On-Site Preparation of Novel Karst Cave Filler Using Shield Waste Sandy Clay
Analysis for Influence Factors and Control of Shield Advance Speed Based on Field Measurement Data
Key Technology of Rapid Conversion of Slurry/Earthpressure Dualmode Shield Tunneling in Nanning Metro Line No. 5
Study on Deformation Characteristics and Control Method of Surrounding Rock of Yangcheng Tunnel in Upper Soil and Lower Sand Strata
Separate Launching Technology of EPB Shield in Narrow Space: a Case Study on Shield Tunnel of Singapore Metro C715 Project
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network