Impact of Excavation Procedures of Shallow Large Crosssection Tunnel with Piperoofing and Frozen Soil on Tunnel Behavior and Ground Movement
ZHANG Dongmei1,2, ZHANG Bokai2, LIU Zhigang3
(1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 2. College of Civil Engineering, Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. The Management Center of Zhuhai Link Road of Hong KongZhuhaiMacao Bridge, Zhuhai 519030, Guangdong, China)
ZHANG Dongmei, ZHANG Bokai, LIU Zhigang. Impact of Excavation Procedures of Shallow Large Crosssection Tunnel with Piperoofing and Frozen Soil on Tunnel Behavior and Ground Movement[J]. Tunnel Construction, 2015, 35(11): 1121-1126.