[1] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[2] |
WU Fengbo, JIN Huai, YANG Qiyan, ZHENG Weiqiang.
Analysis of Ground Transverse Settlement Groove Parameters of Beijing Metro Tunnel
[J]. Tunnel Construction, 2020, 40(5): 660-671.
|
[3] |
宋超业, 贺维国, 吴钇君.
高水压过海盾构隧道建设关键技术可行性初探
[J]. Tunnel Construction, 2020, 40(5): 717-726.
|
[4] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|
[5] |
LI Fayong.
Key Construction Technology of Shield Cutting Pile Foundation
Group of Cast-in-place Piles: a Case Study on Qianhubeilu
Station-Qiubi Station Section of Ningbo Metro Line No. 3
[J]. Tunnel Construction, 2020, 40(4): 569-585.
|
[6] |
QIN Jiajia.
Study on Parameters Control of Shield Tunneling
in Composite Strata in Hefei Area
[J]. Tunnel Construction, 2020, 40(3): 435-443.
|
[7] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[8] |
HAN Xianmin, XIAO Mingqing, LI Wenjiang, ZHU Yongquan.
Influence of Multipipe Jacking of Pipe CurtainStructure Method on Settlement of Platform and Track of Railway Station
[J]. Tunnel Construction, 2020, 40(2): 170-178.
|
[9] |
ZHANG Zhenyi, CHEN Wuhang, XU Youjun, LI Wenbo.
Finite Element Mechanical Analysis of Metro Station Constructed by Cut and Cover TopDown Method Based on AM Pile
[J]. Tunnel Construction, 2020, 40(2): 189-194.
|
[10] |
LIU Jianyou, ZHAO Zhenhua, HAN Lin, LIU Chunxiao.
Subgrade Settlement Control Standards for Shield Tunnel Crossing underneath Highspeed Railway
[J]. Tunnel Construction, 2020, 40(2): 256-260.
|
[11] |
FENG Jimeng, ZENG Sicong, LIU Aiwu, ZHAHG Shufa, ZHANG Junru.
Deformation Control Standards of High-speed Railway Tunnel in Loess by There-bench Method Based on Monitoring Data
[J]. Tunnel Construction, 2020, 40(1): 50-57.
|
[12] |
LI Zhijun, FANG Youliang, XIAO Gang, LAI Wenhui, QU Yong, FU Jinyang, XU Zan.
Ground Deformation Characteristics of Water-rich Gravel Stratum during EPB Shield Stop
[J]. Tunnel Construction, 2020, 40(1): 106-113.
|
[13] |
JU Zhonglin.
Analysis and Control Method of Settlement Deformation of Initial Support in Soft Rock Tunnel
[J]. Tunnel Construction, 2019, 39(S2): 92-102.
|
[14] |
WANG Hemin, XIAO Zunqun, TANG Dongsang, HE Jinjiang, ZHANG Weizhong.
Numerical Simulation and Field Monitoring of Construction Process of Rectangular Pipe Jacking in No. 1 Underground Passage of Shangdu Road Station on Zhengzhou Metro Line 4
[J]. Tunnel Construction, 2019, 39(S2): 110-119.
|
[15] |
GUO Lu, LI Jing, WANG Dongyuan, HAN Ying.
Simulations for Effect of Confined Water Exploitation on Subway Station-tunnel System in Binhai Area of Tianjin
[J]. Tunnel Construction, 2019, 39(S2): 141-146.
|