| [1] |
ZHONG Zilan, TIAN Zhilong, ZHANG Bu, LU Yao, MA Kefei, DU Xiuli.
Experimental Study on Flexural Mechanical Performance of Shield Tunnel Segments Reinforced by Prefabricated Composite Profiles
[J]. Tunnel Construction, 2026, 46(S1): 103-113.
|
| [2] |
HU Qiang, LIU Wenxing, ZHANG Anrui, WU Mingfang, GUO Chun.
Low-Carbon Design Method for Highway Tunnel Lining Maintenance and Reinforcement Based on Life Cycle Assessment and Genetic Algorithm Optimization
[J]. Tunnel Construction, 2026, 46(4): 804-816.
|
| [3] |
HE Kan, XU Lin, LIU Hequn, SU Xing.
Thermal Migration Effect and Temperature Distribution in Cable Area of Long-Distance Highway Tunnels
[J]. Tunnel Construction, 2025, 45(8): 1516-1525.
|
| [4] |
WANG Xiongping, WANG Liang, CHENG Jin, ZHONG Ke.
Effect of Blocked Area on Soil Heat Transfer
Characteristic in ExtraLong Power Cable Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 162-168.
|
| [5] |
SONG Chaoye, JIN Ruohong, WANG Rongrong.
Maintenance and Reinforcement of Operating Municipal Utility Tunnel
[J]. Tunnel Construction, 2018, 38(4): 667-673.
|
| [6] |
CAO Jiong, CHENG Guokai, ZHU Fulong, WANG Congmin, XIA Wen, ZHANG Hao, WANG Fengren.
Study of Infrared Detection Technology for Water Seepage of Cable Tunnel
[J]. Tunnel Construction, 2017, 37(S2): 14-19.
|
| [7] |
LYU Jiankai.
Countermeasures for Shield Crossing Anchor Cable Group during Construction of Cable Tunnel in North Ring of Shenzhen
[J]. Tunnel Construction, 2017, 37(S1): 155-162.
|
| [8] |
WANG Lichuan, XIAO Xiaowen, LIN Hui.
Analysis on Causes for and Renovation of Floor Structure of a Highspeed Railway Tunnel Located in slightlydipping Interbedded Rock Mass
[J]. Tunnel Construction, 2014, 34(9): 823-836.
|
| [9] |
CAO Bo, LIU Bo, NIE Weiping.
Study on Stability of Mined Metro Tunnel Crossing Underneath Existing Cable Tunnels
[J]. Tunnel Construction, 2013, 33(11): 914-920.
|
| [10] |
ZHAO Licai.
Reinforcement Design of and Stress Analysis on Highspeed Railway Tunnel Lining at OCS Anchor Overlaps
[J]. Tunnel Construction, 2013, 33(10): 830-835.
|
| [11] |
CHEN Wen-Xin, LI Zong-Kun, TUN Wen-Long, CHEN Cong-Hai.
Study on Executive Effectiveness of Turnkey System ——An Example of KaoKang Project
[J]. Tunnel Construction, 2011, 31(S1): 429-434.
|
| [12] |
CHEN Wen-Tong, LIU Jian-Long, CHEN Fu-Qing, HE Tai-Yuan, CHEN Cong-Hai.
Case Application of New Technologies in Extra High Voltage
Cable Shieldbored Tunnel
[J]. Tunnel Construction, 2010, 30(S1): 324-332.
|
| [13] |
LIU Hao, XIAO Wuquan, LENG Wuming.
Monitoring and Analysis on Influence of Highrise Building
Construction on Existing Underneath Tunnel
[J]. Tunnel Construction, 2008, 28(4): 434-437,451.
|
| [14] |
ZHOU Biao, XU Yao-Beng, ZHANG Teng.
Study on Fires in Industry Cable Tunnels
[J]. Tunnel Construction, 2008, 28(3): 281-284.
|