Optimal Layout of Monitoring Points for Tunnel Crown Settlement by Using Triangle Area Method

YANG Hao   

  1. (Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China)
  • Received:2015-12-18 Revised:2016-02-19 Online:2016-07-20 Published:2016-07-27

Abstract:

The triangle area method for tunnel crown settlement monitoring by using convergence gauge is an economical and highprecision deformation monitoring method. The mathematical analysis is made on the triangle area method; and an optimal triangle layout of monitoring points is decided by calculating peak value of medium error function of settlement. The results show that the underside length of the triangle, equaling 1.362 5 times waist length, is the best choice which can achieve optimal monitoring precision.

Key words: triangle area method, tunnel crown, settlement monitoring, medium error, optimal monitoring precision