| [1] |
ZHAO Kai, XIA Bing, WANG Lichuan, WANG Haiyan, ZHANG Xuemin, ZHANG Junru.
Zonal Coupling Analysis on Dynamic Effect of Soil- Rock Composite Strata-Structure System Induced by Tunnel Blasting
[J]. Tunnel Construction, 2026, 46(5): 970-984.
|
| [2] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [3] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [4] |
TAN Jianbing, YANG Jianli, CAO Weiming, SHI Chenghua, PENG Xingyu.
Blasting Excavation Control Technology for Ultra-Deep
Shafts Adjacent to Extra-High Voltage Substations
[J]. Tunnel Construction, 2025, 45(S1): 308-317.
|
| [5] |
XIAO Qinghua, YUAN Hao, XIA Jinxuan, OU Xiaoqiang, ZANG Xiwei, ZHONG Dechao, LIU Zhiqiang.
Tunnel Blasting Parameters
Optimization Design Method Based on Three-Dimensional Laser Sensing
[J]. Tunnel Construction, 2024, 44(S1): 8-15.
|
| [6] |
WANG Tiguang.
Impact Analysis of Metro Structures With Different
Construction Methods Repeatedly Crossing Large Municipal Overpasses and
Retaining Walls
Under Complex Environment
[J]. Tunnel Construction, 2023, 43(S2): 78-90.
|
| [7] |
DONG Lipeng, YANG Shannan, LIU Zhiwei.
Research and Application of PipeRoof
Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a
Case Study of Ping′anli Station of Beijing Metro Line
19
[J]. Tunnel Construction, 2023, 43(2): 305-315.
|
| [8] |
LI Yang, CHENG Peng, LI Peng, WANG Ning, LUO Changming, BI Chengcheng.
Research on Construction Technology for SmallRadius
Curved PipeCurtain Mined
Metro Stations
[J]. Tunnel Construction, 2022, 42(7): 1207-1218.
|
| [9] |
ZHANG Heng, LI Chaoxu, WEI Dong, JIANG Bolin, LIANG Bo.
Optimization Design of SuperLarge
CrossSection Metro Station Constructed by Mining Method: a Case Study on Wulidian Station of Chongqing Metro Line 9
[J]. Tunnel Construction, 2021, 41(S2): 574-581.
|
| [10] |
GUO Zhi, TANG Xigang, HAN Lisen, TIAN Bin, DING Shaojun, LU Xiaofeng.
Study and Practice on Negative Ring Launching
Technique for
DoubleShield TBM Used in Qingdao Metro
[J]. Tunnel Construction, 2021, 41(S1): 425-.
|
| [11] |
LI Tiesheng.
Key Technologies for Design and Construction of Metro Station by Pipe-roof PBA Method
[J]. Tunnel Construction, 2020, 40(4): 531-537.
|
| [12] |
FU Xiaoqiang, LIU Jifeng, ZHANG Huizhi, ZHANG Shiping, LEI Zhen.
Principal Component Feature Extraction and Millisecond Delay Recognition of Tunnel Blasting Signal
[J]. Tunnel Construction, 2019, 39(S1): 117-124.
|
| [13] |
SI Yudi.
Construction Technology of Doubleshield TBM Passing through Station in Urban Rail Transit Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 411-419.
|
| [14] |
WEI Xiao, GAO Wenxue, WANG Lintai, CAO Xiaoli.
Analysis and Application of Metro Tunnel Blasting Vibration Signal Based on EEMD
[J]. Tunnel Construction, 2019, 39(8): 1293-1300.
|
| [15] |
LIU Li, GAO Xincai.
Bearing Capacity Calculation of Concretefilled Steel Tubular Column during Construction of Metro Station by PBA Method
[J]. Tunnel Construction, 2019, 39(7): 1152-1157.
|