Abstract:
The waste slurry will be definitely produced during slurry shield tunneling, which would cause serious environmental pollution and high cost. As a result, it is used to replace bentonite and water in backfilled grouting slurry of shield tunnel; and then the influence of it on performance of backfilled grouting slurry is studied. The results show that: 1) The grouting material with specific gravity of 1.16 and viscosity of 22 s is better than the original slurry in terms of flowability and consistency. 2) The grouting material with specific gravity of 1.27 and viscosity of 24 s would reduce the flowability of slurry and affect the pumpability of slurry. 3) The performance of new backfilled grouting slurry can meet relevant requirements by appropriately adjusting watercement ratio and slurry specific gravity. 4) The reusing of waste slurry is economical and environmentally friendly.
Key words: shield, waste slurry, backfilled grouting sand slurry, environmental protection
CLC Number:
U 45
YANG Zhao, HE Zuhao, WU Kexiong. Study of Application of Waste Slurry to Backfilled Grouting of Shield Tunnel[J]. Tunnel Construction, 2017, 37(8): 985-989.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.08.011
http://www.suidaojs.com/EN/Y2017/V37/I8/985
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel