[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[3] |
WANG Famin, SUN Zhenchuan, ZHANG Lianghui, LI Fengyuan, ZHANG Bing, WANG Guo′an.
Design of Super-large Diameter Slurry Shield Used in Shantou Bay Tunnel and Construction Countermeasures for Unfavorable Geology
[J]. Tunnel Construction, 2020, 40(5): 735-746.
|
[4] |
FANG Zhongyu.
Design and Application of Online Temperature Monitoring System for
Cutterhead of Large-diameter Slurry Shield under Atmospheric Pressure:
a Case Study on Wangjiang Road River-crossing Tunnel Project in Hangzhou
[J]. Tunnel Construction, 2020, 40(4): 586-590.
|
[5] |
WU Yanxing, XIAO Wei, ZHOU Qian, SUN Lei, XU Guangyi.
Design and Research of Open Type Rectangular Pipe Jacking Machine
[J]. Tunnel Construction, 2020, 40(4): 591-596.
|
[6] |
XU Huaguo, CHEN Kui, SUN Zhenchuan.
Laboratory Test of Reinforced Concrete Pile Foundation Cutting by Shield Cutterhead
[J]. Tunnel Construction, 2020, 40(1): 35-42.
|
[7] |
HUANG Zhigao, CHEN Peng, HE Yuanfu, LIU Gang, ZHU Xiaotian.
Load and Torque Calculation and Mechanical Performance Analysis of Cutterhead of a 12 m Slurry Shield
[J]. Tunnel Construction, 2019, 39(6): 1021-1029.
|
[8] |
KONG Shaobo.
Design and Optimization for Cutterhead of an Extralarge Diameter Slurry Shield Boring in Submarine Complex Strata
[J]. Tunnel Construction, 2019, 39(6): 1030-1037.
|
[9] |
ZHANG Bing, YANG Yandong, SUN Zhenchuan, MA Liang.
Construction Technology and Countermeasures for TBM Boring in Broken Ground of Gaoligongshan Tunnel
[J]. Tunnel Construction, 2019, 39(5): 851-857.
|
[10] |
TIAN Yanchao, HE Fei, ZHANG Xiao, YANG Tianren.
Overcutting Design for TBM Cutterhead in Longdistance Boring in Soft Rock Condition
[J]. Tunnel Construction, 2019, 39(5): 884-889.
|
[11] |
FAN Lei, JIANG Pengpeng, XUE Guangji.
Key Technologies of Splitunit Rectangular Pipe Jacking Machine: a Case Study of CREG Underground Parking Lot
[J]. Tunnel Construction, 2019, 39(3): 504-510.
|
[12] |
YUAN Libin, LIU Jie, ZHAO Hong, YANG Zhiyong, XU Chao.
Wear Law and Life Prediction of Disc Cutter of Shield in Waterrich Pebble Drift Ground
[J]. Tunnel Construction, 2019, 39(10): 1712-1719.
|
[13] |
JIA Lianhui, XU Zhaohui, NIE Xiaodong, YE Erken·ZHA Muti, HUO Junzhou.
Dynamic Characteristics Analysis of TBM Cutterhead System under Uncertain Working Conditions
[J]. Tunnel Construction, 2019, 39(1): 148-156.
|
[14] |
XU Wanghao, NI Wanyu, ZHAO Haitao, CHEN Shuang.
Research on Driving Parameters of Large Diameter Slurry Shield Tunnel Under Complex Interbedded Strata
[J]. Tunnel Construction, 2018, 38(S2): 373-378.
|
[15] |
ZHENG Yongguang, XUE Guangji, CHEN Jinbo, PANG Wenzhuo.
Development, Application and Prospect of Technology of Specialshaped Boring Machine in China
[J]. Tunnel Construction, 2018, 38(6): 1066-1078.
|