| [1] |
HUANG Fu, XIAO Hui, WANG Yongtao, ZHANG Min, CHEN Jingjing, FANG Wei.
Excavation Face Stability Analysis of a Doubl-Mode Shield
Crossing Soil and Rock Composite Strata Based on Tensile Strength
Cut-off Effect
[J]. Tunnel Construction, 2025, 45(1): 109-119.
|
| [2] |
ZHANG Wengang, HAN Fucheng, SUN Weixin, SU Weijia, YANG Jiafeng, XIAO Peng, YANG Wenyu.
Investigation on Limit
Support Force of Excavation Surface of Shallow-Buried Rectangular Shield Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 108-114.
|
| [3] |
CHEN Yifan, SHEN Xiang, CHEN Xiangsheng.
Instability and Catastrophe Mechanism of Docking
Excavation Face of a Shallow-Buried
Large-Diameter Shield in Subsea Soft Strata
[J]. Tunnel Construction, 2024, 44(4): 712-723.
|
| [4] |
HU Jiannan, ZHU Wei QIAN Yongjin, XING Huitang, WANG Lu, LU Kaijun, WEI Bin.
Study on Seepage Failure of Excavation Face of EPB
Shield Tunneling with
NonFull Chamber
[J]. Tunnel Construction, 2021, 41(S1): 240-.
|
| [5] |
LIU Guoliang, HUANG Feiheng, LUO Jingjing, YANG Feng.
Upper Limit Analysis of Translational Rigid Finite
Elements for Determining Circumferential
Excavation Stability of Tunnels in Nonhomogeneous Clays
[J]. Tunnel Construction, 2021, 41(12): 2073-2082.
|
| [6] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
| [7] |
WANG Famin, SUN Zhenchuan, ZHANG Lianghui, LI Fengyuan, ZHANG Bing, WANG Guo′an.
Design of Super-large Diameter Slurry Shield Used in Shantou Bay Tunnel and Construction Countermeasures for Unfavorable Geology
[J]. Tunnel Construction, 2020, 40(5): 735-746.
|
| [8] |
LI Yang, MA Liuchuang, WANG Feng.
Experimental Construction Technology of Conventional Mechanized Support for Weak Surrounding Rock in Gufu Tunnel
[J]. Tunnel Construction, 2018, 38(8): 1371-1378.
|
| [9] |
MIN Fanlu, SONG Hangbiao, BAI Yuxin, YAO Zhanhu.
Research Progress of Passive Failure of Excavation Face during Slurry Shield Tunneling
[J]. Tunnel Construction, 2018, 38(4): 575-581.
|
| [10] |
LI Guangpeng, LI Yanmin, LI Haonan.
Design and Analysis of Center Driving Hydraulic System of Cutterhead of Pipe Jacking Machine in Composite Ground
[J]. Tunnel Construction, 2017, 37(9): 1173-1178.
|
| [11] |
ZHANG Yazhou, ZHU Wei, CHEN Jian, MIN Fanlu, SHI Hailing.
Study of Causes and Countermeasure of Excavation Face Failure of Slurry Shield Tunnel Stopping Section in Expansive Soil: A Case Study of Slender West Lake Tunnel in Yangzhou
[J]. Tunnel Construction, 2016, 36(5): 549-555.
|
| [12] |
NING Rui, GUO Chao, HUANG Mingli.
Analysis on Adaptability of Cutterhead of a 7 m Shield in Composite Ground:Case Study on Running Tunnel from Chegongmiao Station to Hongshuwan Station on Line 11 of Shenzhen Rail Transit System
[J]. Tunnel Construction, 2015, 35(S2): 176-180.
|
| [13] |
ZHANG Yanliang, WANG Weiqiang, DAN Huijuan.
Calculation of Loadbearing Capacity of Composite Collapsible Loess Ground Consolidated by Column Hammer Pile Method
[J]. Tunnel Construction, 2015, 35(S1): 30-34.
|
| [14] |
WANG Chengzhen.
Study on Stability of Full Clay Excavation Face in Boring of Slurry Shield
[J]. Tunnel Construction, 2015, 35(7): 642-649.
|
| [15] |
LIU Wei.
Ground Conditioning Technology for Shield Tunneling in Composite Strata in Nangchang
[J]. Tunnel Construction, 2015, 35(5): 455-462.
|