| [1] |
ZHU Wenkai, SUN Tianshe, CHENG Cheng, SHI Peixin, LI Kaiyin.
Analytical Model for Calculating Shield Tunnel Lining Uplift Considering Inter-Ring Friction Between Adjoining Segments
[J]. Tunnel Construction, 2026, 46(5): 1005-1015.
|
| [2] |
HUANG Dawei, SHI Liangchen, LUO Wenjun, YAN Jiang, FAN Xiaoyu, ZENG Xiaotao.
Experiment of Lifting a Shield Tunnel by Bag Grouting Method
[J]. Tunnel Construction, 2026, 46(1): 80-89.
|
| [3] |
WANG Jian, CHEN Weitao, HUANG Peng, ZHANG Lixiang, YU Li, WANG Xue, LIU Yuan, LI Junqi, WANG Song.
Geometric Parameters of Spiral Highway Tunnels With
Large Slopes and Small Radius
[J]. Tunnel Construction, 2025, 45(S1): 193-207.
|
| [4] |
WANG Haitao, WANG Yue, SUN Jiuchun.
Development of A Segment
Uplift Model Test System
[J]. Tunnel Construction, 2025, 45(1): 132-138.
|
| [5] |
SONG Hongzhuo, JIANG Annan, RUAN Yingying, MIN Qinghua.
Construction Analysis of Water-Rich Tunnels Based on Hoek-Brown Elastoplastic Hydraulic-Mechanical-Damage Coupling Model
[J]. Tunnel Construction, 2024, 44(S2): 342-351.
|
| [6] |
WANG Gui, YI Binbin, LI Fudong, ZHONG Xiaochun, JIAN Yongzhou, ZHU Cheng, WU Ronghua.
Synchronous Two-component Grout Development and Backfill Grouting Effect of EPB Shield
[J]. Tunnel Construction, 2024, 44(S1): 257-264.
|
| [7] |
DU Chuangdong, DU Yihang, HUANG Xiaofu.
Control Technology for
Segment Dislocation and Attitude
of Large-Diameter Shield Tunnels
[J]. Tunnel Construction, 2024, 44(7): 1510-1519.
|
| [8] |
JIANG Tao.
Automatic Welding
Technology for Steel Segment Lining of Metro Tunnel
[J]. Tunnel Construction, 2024, 44(11): 2283-2292.
|
| [9] |
BAO Yan, MEI Chongbin, XU Pengyu, SUN Zhe, WEN Yucheng.
Crack Identification in
Metro Tunnels Based on Improved YOLOv8 Algorithm
[J]. Tunnel Construction, 2024, 44(10): 1961-1970.
|
| [10] |
YI Guoliang, CHEN Kui, LU Gaoming, ZHOU Jianjun, FAN Wenchao.
Progress in Shield Tunneling Technology for Urban Underground
Space in China
[J]. Tunnel Construction, 2024, 44(1): 1-20.
|
| [11] |
CHEN Jian, JIN Junwei, LI Xinchao, YANG Gongbiao, LI Mingyu, JIN Qianqian.
Segment Uplift of LargeDiameter Tunnel Crossing Yellow River During Construction Based on XGBoost Algorithm
[J]. Tunnel Construction, 2023, 43(S1): 72-80.
|
| [12] |
MA Gang, KANG Zuo, GAO Huyan, YU Wenlong, KANG Jiawei.
Analysis on Safety Risk of Urban Metro Tunnel
Construction in Saturated Soft Loess Stratum and Its Countermeasures
[J]. Tunnel Construction, 2023, 43(S1): 425-433.
|
| [13] |
HAN Xu, ZHANG Bingli, HONG Xiaoxing, ZHU Xianfa, WANG Mingjie, ZHANG Dongmei.
Ground Deformation Caused by Shield Tunneling with
Small Curvature Radius in Sandy Stratum: a Case Study of Nantong Metro Line 1
[J]. Tunnel Construction, 2022, 42(S2): 114-123.
|
| [14] |
LIANG Mengchang, BAI Xuefeng.
Deformation Control Technology of Shield Tunneling
Above a Water Transfer Tunnel in SandyCobble Strata
[J]. Tunnel Construction, 2022, 42(S2): 458-466.
|
| [15] |
HE Zhankun.
Influence of Shield Tunnel of Hangzhou Metro Line 5 on
PileRaft Foundation of Existing Hangzhou South
Railway Station and Construction Control Technology
[J]. Tunnel Construction, 2022, 42(S1): 222-231.
|