[1] |
DUAN Zhiwei, DU Lijie, LYU Haiming, WANG Jiahai, LIU Haidong, FU Yongming.
Real-time Identification Method of TBM Surrounding Rock Excavatability
Grade Based on Principal Component Analysis and BP Neural Network
[J]. Tunnel Construction, 2020, 40(3): 379-388.
|
[2] |
WEI Xiao, GAO Wenxue, WANG Lintai, CAO Xiaoli.
Analysis and Application of Metro Tunnel Blasting Vibration Signal Based on EEMD
[J]. Tunnel Construction, 2019, 39(8): 1293-1300.
|
[3] |
LI Zhitang, YIN Rongshen, MENG Yafeng, DENG Weihua, CHEN Lanjiang.
Analysis of Vibration Response and Cavity Effect of Blasting Construction of Tunnel in SoilRock Interlaced Strata
[J]. Tunnel Construction, 2018, 38(4): 588-593.
|
[4] |
JIANG Yaqin, LIU Dianshu, WU Yu, XIE Feng, YUAN Da, ZHANG Huige.
Experimental Analysis of Blasting Vibration of Jiaohuayu Tunnel on Xingyan Expressway in Beijing
[J]. Tunnel Construction, 2018, 38(2): 224-231.
|
[5] |
GUAN Xiaoming, WANG Xuchun, AN Jianyong, ZHANG Liang, ZHAO Chenxu.
Timedelay Calculation of Tunnel Millisecond Blasting and Application of Vibration Reduction of Electronic Detonators
[J]. Tunnel Construction, 2018, 38(12): 1941-1947.
|
[6] |
WANG Jun, QIU Jingge, YANG Fan, WANG Qingpeng, TAN Tianle.
Study of Disturbance Effect of Tunneling Blasting on Dangerous Rock of a Giant Dry Karst Cave Wall
[J]. Tunnel Construction, 2018, 38(1): 41-49.
|
[7] |
HE Chuang, YIN Dongmei, WANG Hailiang, YAN Honghao.
Analysis of Influence of Free Surface and Minimum Resistance Line on Blasting Vibration
[J]. Tunnel Construction, 2018, 38(1): 50-56.
|
[8] |
HAO Yongxing, LIU Yuyang, ZHOU Jianjun, ZHOU Yang, ZHENG Shujuan, LEI Chao.
Fault Diagnosis on Hydraulic Driving System of Shield Cutterhead Based on VariableWeightedPrincipalComponentAnalysis (VWPCA)
[J]. Tunnel Construction, 2018, 38(1): 118-123.
|
[9] |
DENG E, YANG Weichao, LEI Mingfeng, YIN Rongshen.
Analysis of Surrounding Rock Stability during Blasting Construction of Tunnel with Thin Bedrock Roof
[J]. Tunnel Construction, 2017, 37(11): 1430-1435.
|
[10] |
HE Chuang, WANG Hailiang.
Study of Micro Vibration Blasting Parameters of Multilevel Wedgecutting of Mined Metro Station
[J]. Tunnel Construction, 2016, 36(8): 941-946.
|
[11] |
HU Huirong, HUANG Huadong, WANG Xianyi, LI Lianchao.
Study of Characteristics of Vibration Velocity Amplifying Effect of Building Structures Induced by Tunnel Blasting under Dynamic and Static Conditions
[J]. Tunnel Construction, 2016, 36(7): 812-818.
|
[12] |
JIANG Li, HUANG Huadong, WANG Xianyi, CHEN Huashen.
Application of Tunnel Blasting Vibration Disaster Prediction Based on LMBP Neural Network
[J]. Tunnel Construction, 2016, 36(5): 525-530.
|
[13] |
WANG Yapeng, WANG Hailiang, HE Chuang, WEI Dongdong, LI Ziyuan.
Analysis of Influence of Spacing of Blast Holes with Same Detonation Delay on Maximum Blasting Vibration Velocity
[J]. Tunnel Construction, 2016, 36(10): 1232-1236.
|
[14] |
HE Chuang, WANG Hailiang.
Optimization Analysis on Blasting Parameters forBlasting Control of Metro Station Tunnels
[J]. Tunnel Construction, 2016, 36(1): 97-101.
|
[15] |
LIU Yong.
Monitoring and Analysis of Blasting Vibration during Construction of LPG Storage Cavern in Huangdao
[J]. Tunnel Construction, 2015, 35(9): 878-882.
|