Abstract: During the construction of tunnel lining by conventional lining trolley, many problems exist, i.e. hollows, cracks and falling blocks of secondary lining, easy damage of joint part, lowefficiency of pouring condition and insufficient vibration of crown. A new intelligent lining trolley construction automatic control system integrating functions of trolley pouring condition, trolley concrete distribution system, trolley vibration system, top pressure monitoring, joint monitoring system, trolley hydraulic system, lateral pressure monitoring, walking control system and lining data reports is developed based on functional design scheme of new intelligent lining trolley, traditional construction technology, and informational and intelligent design concepts. The system was applied to Bid No.1 of Jishou Tunnel on ZhangjiajieJishouHuaihua Railway. The applicable results show that by adopting the new intelligent lining trolley construction automatic control system, the automatic, informatized and intelligent lining construction can be realized, the automation level of lining construction can be greatly improved, the labor intensity of workers can be reduced, the hollow quantities behind lining can be effectively reduced, and the lining construction quality can be improved.
Key words: intelligent lining trolley, tunnel, crown vibrating, pouring amount, automatic control, automatic monitoring
CLC Number:
U 455.3+9
WANG Baiquan. Research and Application of Automatic Control System of New Intelligent Lining Trolley Construction[J]. Tunnel Construction, 2019, 39(10): 1728-1736.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2019.10.021
http://www.suidaojs.com/EN/Y2019/V39/I10/1728
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station