Special Investigation Means and Methods of Karst of Kunming Rail Transit

PENG Du1, LIU Wei1, ZHAO Fuyu1, PAN Jianhua1, PENG Jianxing2   

  1. (1. Kunming Survey, Design and Research Institute Co., Ltd. of CREEC, Kunming 650200, Yunnan, China; 2. Yunnan Geological Engineering the Second Investigation Institute, Kunming 650218, Yunnan, China)
  • Received:2019-07-24 Online:2019-12-31 Published:2020-04-04

Abstract:

The developing characteristics of karst cannot be cleared by traditional investigation methods. Hence, the investigation work of karst of Kunming Rail Transit Line 4 is taken for example to introduce the preliminary and detailed investigations of geotechnical engineering. And then the engineering geological drilling and field geophysical testing (cross-hole tomography(CT), high density electrical method and geological radar) are taken as the main investigation methods, and engineering geological surveying, in-situ testing, borehole pumping test and indoor geotechnical testing, etc. are adopted as well to learn the distribution, scale and shape of karst along the line. And a quantitative or qualitative evaluation is carried out. The results can provide reliable geological basis for the design of karst special treatment construction drawings, optimization of design schemes and improvement of construction organization design.

Key words: Kunming Rail Transit Line 4, karst survey means and methods, engineering geological drilling, geophysical testing, cross-hole tomography (CT), high density electrical method, geological radar