ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction

Previous Articles     Next Articles

Study on Calculation Method of Preloading Axial Force of the Locking Foot Anchor in Soil and Rock "Dualistic Foundation Pit" End-Suspended Piles Support System

CHEN Cheng 1 ,YANG Honglin 2   

  1. (1. Guangzhou Metro Design & Research Institute Co. Ltd,Guangzhou 510010Guangdong, China; 2. Shanghai Tunnel Engineering & Rail Transit Design and Research Institute,Shanghai 200292
  • Published:2020-06-17