ISSN 2096-4498
CN 44-1745/U

Tunnel Construction ›› 2020, Vol. 40 ›› Issue (6): 873-879.DOI: 10.3973/j.issn.2096-4498.2020.06.013
Previous Articles Next Articles
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station
LUO Duhao1, JIANG Si1, LIU Jianyou2
(1. The Fourth Engineering Company of China Railway No. 5 Engineering Group Co., Ltd., Shaoguan 512031, Guangdong, China; 2. China Railway Engineering Consulting Group Co., Ltd., Beijing 100055, China)
Online:
2020-06-20
Published:
2020-06-29
CLC Number:
LUO Duhao, JIANG Si, LIU Jianyou.
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station [J]. Tunnel Construction, 2020, 40(6): 873-879.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.06.013
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn