| [1] |
FENG Shouzhong, KAN Deyuan, XIE Chengdong, YAN Zhiguo, SONG Yuan.
Coupling Analysis of Multiple Influencing Factors of Dynamic Visual Distance Based on Tunnel Luminous Environment
[J]. Tunnel Construction, 2026, 46(5): 935-945.
|
| [2] |
HU Qiang, LIU Wenxing, ZHANG Anrui, WU Mingfang, GUO Chun.
Low-Carbon Design Method for Highway Tunnel Lining Maintenance and Reinforcement Based on Life Cycle Assessment and Genetic Algorithm Optimization
[J]. Tunnel Construction, 2026, 46(4): 804-816.
|
| [3] |
ZHOU Zhong, LI Shishuai, LU Wanghao.
A Method for Data Augmentation and Intelligent Recognition of Crack Defects in Highway Tunnel Linings by Integrating Deep Convolutional Generative Adversarial Networks and Dual-Task YOLO Model
[J]. Tunnel Construction, 2025, 45(S2): 380-389.
|
| [4] |
ZHANG Kaiwen, HE Yongjun, ZHANG Yun, WANG Jin, SHUAI Chunyan.
Application of Real-Time Regulation Energy-Efficient System for Highway Tunnel
Lighting
[J]. Tunnel Construction, 2025, 45(S1): 71-79.
|
| [5] |
CAO Xiaoyong, ZHANG Menghan, XI Weizheng, XU Ping, YE Fei, HAN Xingbo.
Corrugated Steel Support Design for Highway Tunnel
Shafts: A Case Study of Yinggeling Tunnel
[J]. Tunnel Construction, 2025, 45(S1): 182-192.
|
| [6] |
WANG Jian, CHEN Weitao, HUANG Peng, ZHANG Lixiang, YU Li, WANG Xue, LIU Yuan, LI Junqi, WANG Song.
Geometric Parameters of Spiral Highway Tunnels With
Large Slopes and Small Radius
[J]. Tunnel Construction, 2025, 45(S1): 193-207.
|
| [7] |
ZHANG Yani, LIU Xiabing, ZHANG Yanlong, CHEN Jinyu, ZHOU Yu.
Long-Term Safety Status Assessment of Operational Highway Tunnel Lining After Breaking Fire Hazard Based on Dynamic Bayesian Network
[J]. Tunnel Construction, 2025, 45(6): 1210-1218.
|
| [8] |
YANG Hong, ZENG Zhongyi, WU Mingfang, TIAN Jiao.
Gas Extraction Technology for Highway Tunnels Passing Through
Low-Angle High-Pressure Gas Outburst Coal Seams
[J]. Tunnel Construction, 2025, 45(5): 982-991.
|
| [9] |
LI Yuhao, WANG Hailin, JIAO Ao, WANG Jianhua, FAN Chuangang, ZHANG Guo, CHENG Ruiqi.
Operational State Assessment and Treatment Strategies
for Existing Fire-Retardant
Coatings in Highway Tunnels
[J]. Tunnel Construction, 2025, 45(5): 1018-1026.
|
| [10] |
FAN Qi, LIN Fang.
Numerical Study on Bending
Performance of Grouted Mortise-Tenon Joint Considering Bonding Strength of Grouting Interface
[J]. Tunnel Construction, 2025, 45(3): 532-538.
|
| [11] |
CHEN Li, LIU Bing, CAO Zhi, CHEN Jiajia, ZHANG Heng, ZHANG Zhiqiang.
Influence of Natural Wind
on Fire Smoke Diffusion Characteristics Through
Shafts in Extra-Long Highway Tunnels
[J]. Tunnel Construction, 2025, 45(2): 315-323.
|
| [12] |
LI Ming, WANG Lei, CUI Hao, CHEN Honglei, SUN Changsong, YANG Zhe.
Interface Temperature Field of Freezing Method Construction for a Super-Large Diameter Shield Tunnel Connecting Channel: A Case Study of Beijing East Sixth Ring Renovation
Project
[J]. Tunnel Construction, 2025, 45(2): 352-360.
|
| [13] |
.
Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels
[J]. Tunnel Construction, 2025, 45(2): 402-414.
|
| [14] |
WANG Jian, CHEN Yongliang, ZHAO Lingyin, WANG Xue, YU Li, LIU Yuan, LI Junqi, LIU Keyi, YOU Zan.
Critical Wind Speed of Somke in Case of Fires Under Water Mist in Spiral Tunnels
[J]. Tunnel Construction, 2025, 45(12): 2228-2239.
|
| [15] |
WU Senyang, LI Qinglin, LI Lin, QIN Feng, CHEN Peng.
Establishment and Evaluation of a Comprehensive Early Warning System for Monitoring Highway Tunnel Deformation
[J]. Tunnel Construction, 2025, 45(12): 2240-2256.
|