| [1] |
LI Shuaiyuan, LU Gaoming, ZHOU Jianjun, YANG Yandong, LIU Yuanguang.
New Progress in Design and Construction Technology of Multimode Tunnel Boring Machines in China
[J]. Tunnel Construction, 2025, 45(S2): 63-75.
|
| [2] |
YI Xiaojun, SONG Zifan, LI Yang, LI Jiacheng, ZHANG Zhongjie, ZHANG Chunhui, LIU Jingsheng, FENG Lihua, LYU Xiangfeng.
Experimental Investigation of Jet Oscillation for Reducing Jacking Resistance Caused by Muck Accumulation in Hard Rock Pipe Jacking
[J]. Tunnel Construction, 2025, 45(8): 1483-1493.
|
| [3] |
ZHOU Peng, SHANG Jianxu, ZHANG Tianyu, XU Jiacan, WANG Zinan, HE Enguang.
Rock-Breaking Mechanism and Specific
Energy of Disc Cutters in Tunnel Boring Machines Under
Different Surrounding Rock Pressures
[J]. Tunnel Construction, 2025, 45(5): 887-894.
|
| [4] |
ZHANG Ruilin.
Research on Connection Tunnel Boring Machine With Circumferential-Cutting Type Cutterhead
[J]. Tunnel Construction, 2025, 45(5): 1001-1008.
|
| [5] |
GOU Chengzhi, LIU Yongbin, ZHANG Xiaoping, LI Xinfang, LIU Bingsen.
Research and Application of Front-Mounted
Exploration Drilling and Grouting Reinforcement Technology in China′s
First Remanufactured Open
Tunnel Boring Machine
[J]. Tunnel Construction, 2025, 45(4): 834-843.
|
| [6] |
.
Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels
[J]. Tunnel Construction, 2025, 45(2): 402-414.
|
| [7] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [8] |
LIU Yaoru, HOU Shaokang, WEI Fang, YU Jialin, HE Wei, CHENG Li, JIAO Pengcheng.
State of the Art and
Development Trends in Intelligent Construction of Tunnel Boring Machines
[J]. Tunnel Construction, 2025, 45(1): 21-45.
|
| [9] |
WANG Zheyong, LIU Chenglong, XU Zhen, XIAO Yongqiang, ZONG Chao, SUN Yingtao, JIANG Yusheng.
Displacement and
Deformation Mode of Complex Rock Strata in Central Urban Area Induced by Double-Shield Tunnel
Boring Machine
[J]. Tunnel Construction, 2024, 44(S2): 135-143.
|
| [10] |
LIU He, MAN Ke, LIU Xiaoli, SONG Zhifei.
Cutterhead Penetration Rate
Prediction of Tunnel Boring Machines Based on Optuna-Self-Attention
Mechanism-Long Short-Term
Memory Model
[J]. Tunnel Construction, 2024, 44(S2): 329-341.
|
| [11] |
WANG Hongshuai, ZHOU Yingxiang, WANG Kaisheng, NIU Wenjuan.
Roughness Reduction Measures of Inner Wall of Long-Distance Free-Flow Water Conveyance Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 399-405.
|
| [12] |
JIANG Qiao, WANG Shuangjing, JING Liujie, SHI Yunlong, WEI Xiaolong, LI Pengyu, YANG Chen.
Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station
[J]. Tunnel Construction, 2024, 44(S2): 470-477.
|
| [13] |
ZHAO Hailei, LIU Wei, PEI Chengyuan, WU Lei, WANG Liming, QIN Yinping, BAI Yanlei.
Design and Experimental Research of a Novel Type of Cutter Holder With Rotating Friction Body for Rapid Cutter Change of
Tunnel Boring Machines
[J]. Tunnel Construction, 2024, 44(S2): 478-484.
|
| [14] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
| [15] |
WANG Wei, YANG Guang, REN Taozhe, DU Kenan, LYU Fengying, WANG Junjie.
Stress Characteristics and Parameter Optimization of Anchor Bolt Support in Small-Section
TBM Tunnels
[J]. Tunnel Construction, 2024, 44(S1): 237-246.
|