| [1] |
LU Chen, ZHANG Shuai, LIU Yanlong, LI Jieyong, LAI Yong, NIE Jianxing, LU Chunxue.
Severe Deformation Mechanism of Surrounding Rock in Deep Grade Ⅵ Water-Rich Soft Rock Tunnels and Analysis of Double-Layer Primary Support Construction Process: A Case Study of Shanyang Tunnel on Dali-Ruili Railway
[J]. Tunnel Construction, 2026, 46(S1): 153-163.
|
| [2] |
LIU Qingzheng YANG Yandong, LU Gaoming, YAN Renfu, ZHANG Yongming, ZHU Xiaoliang, LI Enlei, LIU Wenshuai, WANG Junli, LIU Qiang, YAO Xiaomin, ZHAI Chaojie.
Optimization of Advance Pipe Roof Support Parameters for TBM Tunnels Based on Response Surface Methodology and Genetic Algorithms
[J]. Tunnel Construction, 2026, 46(S1): 443-455.
|
| [3] |
DU Chuangdong, CHEN Lin, SUN Xianghui, HUANG Xiaofu, CHEN Huichao, LI Yuntao.
No Back-Push Rapid Assembly, Propulsion, and Launching Technology for Negative Ring Segments of Large-Diameter Shield Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 477-486.
|
| [4] |
YAO Zhanhu, YANG Nan, ZHANG Yazhou, LIANG Yuqiang, LI Hui, LU Ping, SUN Jingxin.
Full-Scale Model Test for Underground Docking of Shield Tunnels in High Water Pressure and Highly Permeable Strata (I): Platform Design
[J]. Tunnel Construction, 2026, 46(6): 1145-1158.
|
| [5] |
LIAN Jie, YANG Jixiang, TIAN Siming, XING Peigang, CHEN Xiwu, GUO Quan, SHI Zhengying.
Automated Recognition and Management System for Railway Tunnel-Construction Processes
[J]. Tunnel Construction, 2026, 46(6): 1208-1219.
|
| [6] |
LIU Dingli, WU Lu, LIU Junqi, BU Rongwei, FAN Chuangang.
Impact of Passenger Load Factor Variation on Evacuation Time in Underwater Shield Tunnels
[J]. Tunnel Construction, 2026, 46(6): 1220-1230.
|
| [7] |
ZHANG Yazhou, YANG Nan, YAO Zhanhu, ZHANG Lei, REN Yanwu, YAN Xiao, WEI Daiwei.
Full-Scale Model Test for Underground Docking of Shield Tunnels in High Water Pressure and Highly Permeable Strata (Ⅱ): Testing Methods and Application Verification
[J]. Tunnel Construction, 2026, 46(6): 1231-1243.
|
| [8] |
YAN Xiao, ZHANG Yazhou, YAO Zhanhu, ZHANG Dongmei, ZHANG Lei, XU Mingyuan, ZHOU Wending, LIANG Yuqiang, LU Mingfei, LI Hui.
Comparison and Selection of Structural Schemes for Underground Shield Docking in High-Water-Pressure Saturated Sandy Stratum and Its Engineering Application
[J]. Tunnel Construction, 2026, 46(6): 1330-1341.
|
| [9] |
GUO Jingbo, LI Jingkai, LI Jie, YANG Shaopu, WANG Yongjie, LIU Chuang, HAN Mengze, HUANG Yuanjun.
Research Status and Prospects of Tail Sealing Technology for Shield Machines
[J]. Tunnel Construction, 2026, 46(4): 647-664.
|
| [10] |
XU Qingsong, SHI Aijun, CHEN Bin, MA Shuqi, ZHAO Yan.
Full Acoustic Waveform Signal Processing for Analysis of Blasting Damage of Surrounding Rock in Tunnels
[J]. Tunnel Construction, 2026, 46(2): 273-286.
|
| [11] |
YI Xuanxuan, PAN Ting, DU Zhigang, HE Shiming.
Experimental Study on Optimization of Fatigue-Sensitive Zones for Extra-Long Urban Tunnels Based on Simulated Driving
[J]. Tunnel Construction, 2026, 46(2): 310-321.
|
| [12] |
DENG Bin, SONG Jiaying, ZHANG Aiping, GUAN Zhixin, ZHANG Wen, JIANG Changbo.
Multi-Objective Optimization of Cross-Sectional Design and Safe Navigation Speed in Navigable Tunnels
[J]. Tunnel Construction, 2026, 46(1): 145-156.
|
| [13] |
ZHOU Zhong, LI Shishuai, LU Wanghao.
A Method for Data Augmentation and Intelligent Recognition of Crack Defects in Highway Tunnel Linings by Integrating Deep Convolutional Generative Adversarial Networks and Dual-Task YOLO Model
[J]. Tunnel Construction, 2025, 45(S2): 380-389.
|
| [14] |
WANG Chen, MA Weibin, LIU Yanqing, NING Cancheng, HAN Jiaqiang, LI Shanduo, PENG Yang, CHENG Aijun.
Types and Parameters of Equal Section Buffer Structures at Entrance of High-Speed Railway Tunnels With 400 km/h Speed
[J]. Tunnel Construction, 2025, 45(9): 1649-1663.
|
| [15] |
XU Chen, XIAO Mingqing, XUE Guangqiao, HE Yingdao, XU Wei, WANG Chunhui.
Propagation Mechanisms and Environmental Responses of Train-Induced Vibrations in High-Speed Railway Shield Tunnels: A 2.5-Dimensional Finite Element Method-Method of Fundamental Solutions Approach
[J]. Tunnel Construction, 2025, 45(7): 1260-1271.
|