ISSN 2096-4498
CN 44-1745/U
Tunnel Construction
Previous Articles Next Articles
XU Jianjun
Published:
Abstract: The mudstone-sandstone interbed is prone to large deformation, so the reasonable support timing is extremely important. In order to explore the reasonable support timing of the large-section mudstone-sandstone interbed tunnel and to guide the construction in practical application, relying on the Huipaishan tunnel of China-Laos railway, the support timing and full displacement inversion of the large-section mudstone-sandstone interbed tunnel are carried out.Firstly, the engineering characteristics of the rock mass are studied by triaxial compression test, and the mechanical parameters of the rock mass are modified based on the Hooke Brown strength criterion to provide the basis for the later numerical calculation.Further, through the derivation of the total displacement, combined with the field monitoring data, the relationship between the total displacement and the measured displacement is obtained.Finally, the relationship between the settlement of the vault and the radius of the plastic zone is obtained by numerical simulation, and the characteristic points are found to determine the timing of the initial support and the strengthening support. According to the relationship between the measured displacement and the full displacement, the best support timing based on the field monitoring data is obtained.The results show that :(1) The condition of mudstone-sandstone interbedded surrounding rock is poor, and the mechanical index parameters are about half lower than that of single surrounding rock.(2) The measured displacement accounts for 60% ~ 70% of the total displacement, and the relationship between the measured displacement and the total displacement is obtained.(3) The tunnel needs to be supported with the excavation, and when the on-site monitoring vault settlement reaches 170 mm and there is no convergence trend, the support measures should be strengthened.
Key words: railway tunnel, supporting time, mudstone sandstone interbedded strata, triaxial compression test, numerical simulation
XU Jianjun. Study on Support Timing of Mudstone-Sandstone Interbedded Tunnel in China-Laos Railway Based on Displacement Inversion#br#[J]. Tunnel Construction.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
Current Status of Prefabricated Structural Technology in Underground Engineering and Its Research and Application in Railway Tunnels
Construction Technology of Prefabricated Inverted Arch in Single-Track Railway Tunnels by Mining Method
Spatio-Temporal Evolution Pattern and Sensitivity Analysis of Freezing Temperature Field of Shaft in Water-Rich Sand Layer With Groundwater Seepage
Carbon Emission Accounting Methods and Management Paths in Embodied Stage of Railway Tunnels
Interface Temperature Field of Freezing Method Construction for a Super-Large Diameter Shield Tunnel Connecting Channel: A Case Study of Beijing East Sixth Ring Renovation Project
Research Progress on Interface Failure Mechanism and Constitutive Model of Anchorage Structure
Application of Improved Pelican Optimization Algorithm-Convolutional Neural Networks-Bidirectional Gated Recurrent Unit Model in Predicting Foundation Pit Dewatering