| [1] |
WANG Yi, ZHENG Wenbao, LUO Gang, LIU Jianping.
Multi-Objective Optimization of a Large-Diameter Shield Cutterhead System and Tunneling Parameters in Complex Strata
[J]. Tunnel Construction, 2026, 46(5): 1109-1120.
|
| [2] |
GUO Xuhan, ZHAO Wen, BAI Qian, LI Jialong.
Classification and Prediction of Soil Conditioning Effects for Shield Tunneling in Sandy Strata Based on Tunneling Parameters
[J]. Tunnel Construction, 2026, 46(3): 599-608.
|
| [3] |
LI Wenqing, LIU Yongsheng, HONG Kairong, KOU Lei, TAN Zhongsheng, XU Weiqing, MA Shiju, ZHU Yongchao, YU Jingbo.
Mapping Relationships Between TBM Tunneling Parameters and Surrounding Rock Grades
[J]. Tunnel Construction, 2026, 46(2): 336-347.
|
| [4] |
LI Shuaiyuan, LU Gaoming, ZHOU Jianjun, YANG Yandong, LIU Yuanguang.
New Progress in Design and Construction Technology of Multimode Tunnel Boring Machines in China
[J]. Tunnel Construction, 2025, 45(S2): 63-75.
|
| [5] |
ZHOU Peng, SHANG Jianxu, ZHANG Tianyu, XU Jiacan, WANG Zinan, HE Enguang.
Rock-Breaking Mechanism and Specific
Energy of Disc Cutters in Tunnel Boring Machines Under
Different Surrounding Rock Pressures
[J]. Tunnel Construction, 2025, 45(5): 887-894.
|
| [6] |
ZHANG Ruilin.
Research on Connection Tunnel Boring Machine With Circumferential-Cutting Type Cutterhead
[J]. Tunnel Construction, 2025, 45(5): 1001-1008.
|
| [7] |
GOU Chengzhi, LIU Yongbin, ZHANG Xiaoping, LI Xinfang, LIU Bingsen.
Research and Application of Front-Mounted
Exploration Drilling and Grouting Reinforcement Technology in China′s
First Remanufactured Open
Tunnel Boring Machine
[J]. Tunnel Construction, 2025, 45(4): 834-843.
|
| [8] |
.
Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels
[J]. Tunnel Construction, 2025, 45(2): 402-414.
|
| [9] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [10] |
LIU Yaoru, HOU Shaokang, WEI Fang, YU Jialin, HE Wei, CHENG Li, JIAO Pengcheng.
State of the Art and
Development Trends in Intelligent Construction of Tunnel Boring Machines
[J]. Tunnel Construction, 2025, 45(1): 21-45.
|
| [11] |
WANG Zheyong, LIU Chenglong, XU Zhen, XIAO Yongqiang, ZONG Chao, SUN Yingtao, JIANG Yusheng.
Displacement and
Deformation Mode of Complex Rock Strata in Central Urban Area Induced by Double-Shield Tunnel
Boring Machine
[J]. Tunnel Construction, 2024, 44(S2): 135-143.
|
| [12] |
LIU He, MAN Ke, LIU Xiaoli, SONG Zhifei.
Cutterhead Penetration Rate
Prediction of Tunnel Boring Machines Based on Optuna-Self-Attention
Mechanism-Long Short-Term
Memory Model
[J]. Tunnel Construction, 2024, 44(S2): 329-341.
|
| [13] |
WANG Hongshuai, ZHOU Yingxiang, WANG Kaisheng, NIU Wenjuan.
Roughness Reduction Measures of Inner Wall of Long-Distance Free-Flow Water Conveyance Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 399-405.
|
| [14] |
ZHAO Hailei, LIU Wei, PEI Chengyuan, WU Lei, WANG Liming, QIN Yinping, BAI Yanlei.
Design and Experimental Research of a Novel Type of Cutter Holder With Rotating Friction Body for Rapid Cutter Change of
Tunnel Boring Machines
[J]. Tunnel Construction, 2024, 44(S2): 478-484.
|
| [15] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|