[1] |
ZHOU Peng, SHANG Jianxu, ZHANG Tianyu, XU Jiacan, WANG Zinan, HE Enguang.
Rock-Breaking Mechanism and Specific
Energy of Disc Cutters in Tunnel Boring Machines Under
Different Surrounding Rock Pressures
[J]. Tunnel Construction, 2025, 45(5): 887-894.
|
[2] |
GOU Chengzhi, LIU Yongbin, ZHANG Xiaoping, LI Xinfang, LIU Bingsen.
Research and Application of Front-Mounted
Exploration Drilling and Grouting Reinforcement Technology in China′s
First Remanufactured Open
Tunnel Boring Machine
[J]. Tunnel Construction, 2025, 45(4): 834-843.
|
[3] |
.
Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels
[J]. Tunnel Construction, 2025, 45(2): 402-414.
|
[4] |
LIU Yaoru, HOU Shaokang, WEI Fang, YU Jialin, HE Wei, CHENG Li, JIAO Pengcheng.
State of the Art and
Development Trends in Intelligent Construction of Tunnel Boring Machines
[J]. Tunnel Construction, 2025, 45(1): 21-45.
|
[5] |
WANG Zheyong, LIU Chenglong, XU Zhen, XIAO Yongqiang, ZONG Chao, SUN Yingtao, JIANG Yusheng.
Displacement and
Deformation Mode of Complex Rock Strata in Central Urban Area Induced by Double-Shield Tunnel
Boring Machine
[J]. Tunnel Construction, 2024, 44(S2): 135-143.
|
[6] |
LIU He, MAN Ke, LIU Xiaoli, SONG Zhifei.
Cutterhead Penetration Rate
Prediction of Tunnel Boring Machines Based on Optuna-Self-Attention
Mechanism-Long Short-Term
Memory Model
[J]. Tunnel Construction, 2024, 44(S2): 329-341.
|
[7] |
WANG Hongshuai, ZHOU Yingxiang, WANG Kaisheng, NIU Wenjuan.
Roughness Reduction Measures of Inner Wall of Long-Distance Free-Flow Water Conveyance Tunnel
[J]. Tunnel Construction, 2024, 44(S2): 399-405.
|
[8] |
JIANG Qiao, WANG Shuangjing, JING Liujie, SHI Yunlong, WEI Xiaolong, LI Pengyu, YANG Chen.
Disc Cutter Wear of Tunnel Boring Machine in Hard Rocks of Pumped Storage Hydropower Station
[J]. Tunnel Construction, 2024, 44(S2): 470-477.
|
[9] |
ZHAO Hailei, LIU Wei, PEI Chengyuan, WU Lei, WANG Liming, QIN Yinping, BAI Yanlei.
Design and Experimental Research of a Novel Type of Cutter Holder With Rotating Friction Body for Rapid Cutter Change of
Tunnel Boring Machines
[J]. Tunnel Construction, 2024, 44(S2): 478-484.
|
[10] |
QUAN Yongwei, WANG Liming, ZHAO Hailei, LI Fengyuan.
Multi-Vehicle Dispatch Management Technology and System Development for Ultra-Long-Distance TBM Tunnels: A Case Study on a Water Supply Project in Northern
Xinjiang
[J]. Tunnel Construction, 2024, 44(S1): 105-112.
|
[11] |
WANG Wei, YANG Guang, REN Taozhe, DU Kenan, LYU Fengying, WANG Junjie.
Stress Characteristics and Parameter Optimization of Anchor Bolt Support in Small-Section
TBM Tunnels
[J]. Tunnel Construction, 2024, 44(S1): 237-246.
|
[12] |
ZHANG Xinyi, WANG Mingbo, LI Jiaheng, CHENG Yonglong, PENG Zhanjie.
Optimization of Main Drive Sealing Structure of Tunnel Boring Machine Based on Orthogonal Test
[J]. Tunnel Construction, 2024, 44(S1): 437-447.
|
[13] |
JIA Lianhui, SUN Heng, ZHANG Xingbin, YU Qingzeng, LI Lei, NING Xiangke.
Crucial Construction
Technology of Tunnel Boring Machines for Constructing Large-Slope Inclined Shaft in Pumped Storage
Power Station
[J]. Tunnel Construction, 2024, 44(8): 1660-1668.
|
[14] |
ZHOU Zhenliang, LEI Ke, LI Qinglou, XIAO Haihui, SU Shan.
Correlation Between Surrounding Rock Conditions and
RockSlag Grading of Tunnels Bored Using Tunnel
Boring Machines Via Image Recognition
[J]. Tunnel Construction, 2024, 44(5): 964-972.
|
[15] |
LI Zonglin, LI Qinglou, ZHANG Lilong, GUO Yang.
Correlation Analysis Between Surrounding Rock
Parameters and Mainframe Vibration of an Open Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(5): 991-999.
|