ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (2): 152-156.DOI: A

• wenzhang • Previous Articles     Next Articles

Study on Longitudinal Deformation of RiverCrossing Shieldbored
Tunnel Caused by Riverbed Scouring and Siltation

ZHANG Jun1, ZHANG Chixiang2   

  1. 1. Parsons Brinckerhoff Engineering Technology (Beijing) Co. Ltd.2. The Second Survey and Design Institute of CREC
  • Received:2008-10-15 Revised:2009-03-09 Online:2009-04-20 Published:2009-11-17
  • Supported by:

     张军(1980—),男,安徽淮北人,2005年毕业于北京科技大学工程力学专业,硕士,工程师,从事轨道交通技术研究。

Abstract:

One of the main reasons for the longitudinal deformation of rivercrossing tunnels is riverbed scouring and siltation. Taking the construction of Qiantang River Crossing Tunnel on No.2 line of Hangzhou Metro as an example, the authors present the mechanisms of the longitudinal deformation of rivercrossing tunnels caused by riverbed scouring and siltation by means of numerical simulation and theoretical calculation. Furthermore, they educe the longitudinal deformation curve of the tunnel by means of crosssection calculation, demonstrate the relation between the connection stiffness of the lining segments and the longitudinal deformation of the tunnel, and finally make some advice to control the  longitudinal deformation of the tunnel.

CLC Number: